Microcom Corp

Basic Information

965 Thomas Drive
Warminster, PA, 18974

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 22


  1. Universal Two Stage GPS/INS Integration for Test Range Applications

    Amount: $69,314.00

    Microcom Corporation and Chaffee Associates propose to design a Time Space Position Information (TSPI) module that will provide Universal Two Stage GPS/INS Integration for Test and Training Range appl ...

    SBIR Phase I 1994 Navy Department of Defense
  2. DATA RELAY SYSTEM

    Amount: $748,440.00

    Microcom will design a secure Data Relay System for transmission of GPS position, platform sensor, and weapons event data collected from a large number of fleet exercise participants distributed over ...

    SBIR Phase II 1993 Navy Department of Defense
  3. DUAL TRANSPONDER FOR RANGING AND DATA COMMUNICATION

    Amount: $2,467,580.00

    Microcom will design a Dual Frequency Transponder which will be compatible with the requirements of both the Tactical Aircrew Combat Training System (TACTS) and the Mobile Sea Range (MSH) system. We w ...

    SBIR Phase II 1993 Navy Department of Defense
  4. DUAL TRANSPONDER FOR RANGING AND DATA COMMUNICATION

    Amount: $49,905.00

    N/A

    SBIR Phase I 1992 Navy Department of Defense
  5. DATA RELAY SYSTEM

    Amount: $49,915.00

    N/A

    SBIR Phase I 1992 Navy Department of Defense
  6. DATA COMPRESSION APPLIED TO DOPPLER SCORING SIGNALS ^

    Amount: $49,978.00

    MICROCOM PURPOSES TO STUDY AND PROPOSE AN EFFECTIVE METHOD TO COMPRESS THE DOPPLER SIGNALS AS THE ULTIMATE GOAL IS TO TRANSMIT THE RESULTANT DATA ON A NARROW BAND TELEMETRY CHANNEL. MICROCOM HAS PREVI ...

    SBIR Phase I 1991 Navy Department of Defense
  7. SOUNDING ROCKET AIRBORNE INSTRUMENTATION SYSTEM

    Amount: $48,881.00

    MICROCOM PROPOSES TO STUDY AND DEFINE SOUNDING ROCKET INSTRUMENTATION REQUIREMENTS AND DESIGN A STANDARD IRIG TELEMETER WHICH WILL TRANSMIT DATA FOR ANALYSIS OF ROCKET PERFORMANCE. THE STUDY WILL USE ...

    SBIR Phase I 1989 Air Force Department of Defense
  8. HIGH DENSITY ELECTRONIC PACKING CONCEPTS

    Amount: $46,082.00

    MICROCOM PROPOSES TO STUDY A VERY HIGH SPEED (100 TO 800 MBITS/SEC) DATA LINK WHICH WILL SAMPLE AND STORE PARALLEL DATA AND CONTROL INPUTS AND TRANSMIT THEM SERIALLY TO A REMOTE DESTINATION WHERE THE ...

    SBIR Phase I 1989 Navy Department of Defense
  9. FEASIBILITY STUDY ULTRA SMALL TRANSPONDERS FOR MISSILE TEST AND EVALUATION

    Amount: $63,545.00

    MICROCOM PROPOSES TO APPLY MODERN RF AND SURFACE MOUNT TECHNOLOGY TO PMTC TRANSPONDER DESIGNS TO GAIN: 1. SIZE/WEIGHT REDUCTION; 2. INCREASED RELIABILITY; 3. IMMPROVED DATA QUALITY; 4. POWER EFFICIENC ...

    SBIR Phase I 1988 Navy Department of Defense
  10. ENGINEERING STUDY SECURE VIDEO DOPPLER

    Amount: $496,000.00

    VIDEO DOPPLER INFORMATION IS A MAJOR REQUIREMENT TO EVALUATE THE PERFORMANCE OF MANY AIRCRAFTS AND GROUND LAUNCHED MISSILES. IT IS THE PARAMETER WHICH IS MOST GUARDED IN MISSILE TESTING BECAUSE IT PRO ...

    SBIR Phase II 1986 Navy Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government