You are here

MOHAWK INNOVATIVE TECHNOLOGY, INC.

Company Information
Address
1037 WATERVLIET SHAKER RD
ALBANY, NY 12205-2032
United States


http://www.mohawkinnovative.com

Information

UEI: ZY3GYFN4ELC4

# of Employees: 6


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. Advanced Modular, Energy Storage Technology

    Amount: $298,888.00

    The overall objective of the Phase I and Phase II proposed effort is to design, test and demonstrate the ability of a 500 kW test bed prototype energy storage module to withstand a shipboard environme ...

    SBIRPhase II2011Department of Defense Navy
  2. Innovative Bearing Concepts For High Speed Rotating Machines

    Amount: $999,366.00

    Based on the successful analytical and experimental Phase I effort, the MiTi Phase II effort will establish the detailed design of a high damping, high load capacity and robust debris tolerant complia ...

    SBIRPhase II2011Department of Defense Navy
  3. Small Engines Designed for High Efficiency, High Power Density and Quiet Operations

    Amount: $1,278,700.00

    The overall objective of the Phase II proposed effort is to develop the crucial oil-free, high-speed power generation system technologies that will make a suite of small modular engines for power and ...

    SBIRPhase II2010Department of Defense Defense Advanced Research Projects Agency
  4. SBIR Phase I:ULTRAHIGH SPEED MICROMACHINING SPINDLE

    Amount: $149,998.00

    This Small Business Innovation Research (SBIR) Phase I project aims to develop an ultrahigh speed, precision, micro-milling spindle. The trends in industrial and military products that demand miniatur ...

    SBIRPhase I2010National Science Foundation
  5. Innovative Bearing Concepts For High Speed Rotating Machines

    Amount: $148,593.00

    Under Phase I, MiTi will first review existing Navy data and materials to more thoroughly define the potential Air Cycle Machine foil bearing failure modes including different potential contaminants a ...

    SBIRPhase I2010Department of Defense Navy
  6. High Speed Low-Damage Dental Machining Center (Phase II)

    Amount: $693,935.00

    DESCRIPTION (provided by applicant): The overall objective of the proposed SBIR program is to design, manufacture, and evaluate a high-speed, low-damage, machining center for fabrication of dental re ...

    SBIRPhase II2009Department of Health and Human Services National Institutes of Health
  7. Self-Sensing Physiologic Control of a Rotary Mag Lev LVAD

    Amount: $743,700.00

    DESCRIPTION (provided by applicant): Heart failure is the number one cause of death in the United States and presents an increasing public burden of morbidity and mortality even as the mortality from ...

    SBIRPhase II2009Department of Health and Human Services National Institutes of Health
  8. Small Engines Designed for High Efficiency, High Power Density and Quiet Operations

    Amount: $98,655.00

    The overall objective of the Phase I and Phase II proposed effort is to develop the crucial oil-free, high-speed power generation system technologies that will make a suite of small modular engines fo ...

    SBIRPhase I2009Department of Defense Defense Advanced Research Projects Agency
  9. Advanced Modular, Energy Storage Technology

    Amount: $99,402.00

    The overall objective of the Phase I and Phase II proposed effort is to design, test and demonstrate the ability of a 500 kW test bed prototype energy storage module to withstand a shipboard environme ...

    SBIRPhase I2009Department of Defense Navy
  10. High Temperature Solid Lubricant Coatings for Air Foil Bearings

    Amount: $99,521.00

    The objective of this program is to develop a robust foil bearing system suitable for application to the Liberty Works high mach engines for RATTLRS and BLACKSWIFT.  An integral objective is to ident ...

    SBIRPhase I2009Department of Defense Air Force
US Flag An Official Website of the United States Government