Mohr And Associates

Basic Information

1440 Agnes St
Richland, WA, 99352

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 5


  1. THROUGH 50 CALIBER CARTRIDGE BRASS CUP DIMENSIONS AND HARDNESS

    Amount: $49,992.00

    THE U.S. ARMY'S SMALL CALIBER AMMUNITION MODERNIZATION PROGRAM (SCAMP) CARTRIDGE BRASS (70/30) CUP INSPECTION IS CURRENTLY A MANUAL PROCESS THAT IS BASED ON THE DIMENSIONAL AND HARDNESS (OR GRAIN SIZE ...

    SBIR Phase I 1986 Army Department of Defense
  2. TIME DOMAIN REFLECTOMETRY LIQUID LEVEL DETECTION DATA EVALUATION AND CONCEPT ASSESSMENT

    Amount: $259,993.00

    THIS PROGRAM DEALS WITH THE EVALUATION OF LIQUID LEVEL DETECTION DATA OBTAINED DURING THE MT-4 EXPERIMENT, WHICH IS THE LAST TEST PERFORMED IN THE LOCA SIMULATION IN NRU REACTOR PROGRAM. THESE DATA OF ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
  3. BUNDLES UNDER LOW REFLOOD RATES AND BOIL OFF CONDITIONS

    Amount: $49,512.00

    THIS PROGRAM DEALS WITH USING THE DIGITIZED VIDEO TDR LIQUIDLEVEL DATA PREPARED UNDER CONTRACT (NRC-04-84-146) OF THE MEMT-4 TEST FROM THE LOCA SIMULATION IN NRU PROGRAM. THESE NEW DATA AND TECHNIQUES ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  4. TIME DOMAIN REFLECTOMETRY LIQUID LEVEL DETECTION DATA EVALUATION AND CONCEPT ASSESSMENT

    Amount: $49,274.00

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission

Agency Micro-sites

US Flag An Official Website of the United States Government