Multi-phase Technologies, Llc

Address

310 Rebecca Drive
Sparks, NV, 89441-7523

Information

DUNS: 792444155
# of Employees: 8

Ownership Information

Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N

Award Charts




Award Listing

  1. An Integrated System for Borehole Magnetometric Resistivity and Electrical Resistivity Tomography Data Acquistion, Processing and Visualization

    Amount: $149,391.00

    The U.S. DOE Office of Environmental Management (EM) was created in 1989 to manage the cleanup of large areas of environmentally contaminated sites. Since the closure of many of these sites, U.S. taxp ...

    SBIRPhase I2013Department of Energy
  2. Wireless Electrical Resistivity Tomography System for CO2 Sequestration Monitoring

    Amount: $381,928.00

    An effort is underway by the U.S. DOE to develop cost-effective and environmentally sound technologies in order to help to stabilize atmospheric concentrations of CO2 and to reduce greenhouse gas emis ...

    SBIRPhase II2010Department of Energy
  3. Wireless Electrical Resistivity Tomography System for CO2 Sequestration Monitoring

    Amount: $99,841.00

    Geologic carbon sequestration has become an effective technology for reducing atmospheric levels of CO2 by capturing emissions and injecting them into underground geologic formations where they can be ...

    SBIRPhase I2009Department of Energy
  4. Determining Spectral Properties of Rocks and Sediments from Broadband Electrical/Electromagnetic Data Processing

    Amount: $99,579.00

    Although a number of new technologies are becoming available for environmental site remediation, the successful application of these technologies often depends on detailed knowledge of the site hydrog ...

    SBIRPhase I2009Department of Energy
  5. An Ultra-Precise System for Electrical Resistivity Tomography Measurements

    Amount: $493,755.00

    One of the most widely used geophysical methods for monitoring flow within the shallow subsurface is Electrical Resistivity Tomography (ERT). The latest generation of ERT systems can monitor data to ...

    SBIRPhase II2006Department of Energy
  6. Automated Impedance Tomography for Monitoring Permeable Reactive Barrier Health

    Amount: $651,504.00

    76166B Although permeable reactive barriers (PRBs) are an important treatment option for groundwater remediation, no reliable methods are available to monitor or predict their long-term behavior. Th ...

    SBIRPhase II2005Department of Energy
  7. An Ultra-Precise System for Electrical Resistivity Tomography Measurements

    Amount: $99,350.00

    78301S One of the most widely used geophysical methods for monitoring flow within the shallow subsurface is Electrical Resistively Tomography (ERT). The latest generation of ERT systems can monitor ...

    SBIRPhase I2005Department of Energy
  8. Automated Impedance Tomography for Monitoring Permeable Reactive Barrier Health

    Amount: $99,857.00

    76166-Although permeable reactive barriers are an important new treatment option for groundwater remediation, no reliable methods are available to monitor or predict their long-term behavior. The lar ...

    SBIRPhase I2004Department of Energy
  9. Fast, Portable Characterization System, Integrating Time-Domain Electromagnetic with Induced and Natural Field Magnetic Measurements

    Amount: $99,902.00

    75605-The United States Department of Energy has estimated that from the 1940s through the 1970s, 126,000 cubic meters of transuranic wastes were disposed of by shallow burial and other techniques at ...

    SBIRPhase I2004Department of Energy
  10. Combined Electrical and Magnetic Resistivity Tomography Environmental Monitoring

    Amount: $97,423.00

    70449 There have been a number of cases, particularly in the subsurface vadose zone, where contaminants have moved much more quickly than expected. Recent examples include the apparent movement ...

    SBIRPhase I2002Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government