National Electrostatics Corp.

Basic Information

7540 Graber Rd
Po Box 620310
Middleton, WI, 53562

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: n/a


  1. DESIGN STUDY FOR A REDUCED ENERGY AND SIZE, PULSED DEUTERON ACCELERATOR FOR USE IN A PFNA EXPLOSIVES DETECTION SYSTEM.

    Amount: $74,447.00

    A PROTOTYPE FOR AN EXPLOSIVE DETECTION SYSTEM USING PULSED FAST NEUTRON ACTIVATION (PFNA) TECHNIQUES USES AN ELECTROSTATIC TANDEM ACCELERATOR TO PRODUCE NANOSECOND WIDTH PULSES OF 6 MEV DEUTERONS. WHI ...

    SBIR Phase I 1993 Department of Transportation
  2. DESIGN OF COMPONENTS FOR AN AMPERE INTENSITY, MEV ENERGY, DC ELECTRON BEAM SYSTEM

    Amount: $379,988.00

    NATIONAL ELECTROSTATICS CORPORATION (NEC) PROPOSES TO DESIGNCRITICAL COMPONENTS, AND INVESTIGATE REQUIRED ION OPTICAL ELEMENTS FOR A 3 MEV, 2-5 AMP DC ELECTRON BEAM. SUCH A SYSTEM WOULD BE BASED ON A ...

    SBIR Phase II 1984 Department of Energy
  3. DESIGN OF COMPONENTS FOR AN AMPERE INTENSITY, MEV ENERGY, DC ELECTRON BEAM SYSTEM

    Amount: $25,000.00

    N/A

    SBIR Phase I 1983 Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government