NDT TECHNOLOGIES, INC.

Basic Information

1726 Ellington Road
P.O.Box 637
South Windsor, CT, 06074 2739

Company Profile

n/a

Additional Details

Field Value
DUNS: 42186007
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 3


  1. Reliable Tool for Assessing Structural Integrity of Guy Wires on Tall Antenna Tower

    Amount: $69,867.00

    The objective of the proposed Exploratory Development effort is to prove feasibility of advanced concepts for a lightweight tool for regularly inspecting the guy wires that support tall antenna towers ...

    SBIR Phase I 2007 NavyDepartment of DefenseDepartment of Defense
  2. Reliable Tool for Assessing Structural Integrity of Guy Wires on Tall Antenna Tower

    Amount: $182,999.00

    The objective of this proposal is to develop a lightweight tool for regularly inspecting the guy wires that support large antenna towers. In particular, the objective of the proposed exploratory dev ...

    SBIR Phase II 2007 NavyDepartment of DefenseDepartment of Defense
  3. DC-TO-400HZ INVERTER

    Amount: $49,997.00

    NDT TECHNOLOGIES, INC. HAS RECENTLY DEMONSTRATED THE FEASIBILITY OF A SIMPLE, LIGHTWEIGHT, HIGH-EFFICIENCY POWER CONDITIONING MODULE. THE MODULE IS VERY VERSATILE AND CAN BE USED AS A BUILDING BLOCK F ...

    SBIR Phase I 1988 National Aeronautics and Space Administration
  4. POWER AMPLIFICATION FOR UNDERWATER ELECTROACOUSTIC TRANSDUCERS

    Amount: $49,997.00

    EXPLORATORY DESIGN, DEVELOPMENT AND DEMONSTRATION OF A COMPACT SWITCHMODE POWER AMPLIFIER FOR UNDERWATER ACOUSTIC TRANSDUCERS IS PROPOSED. THIS AMPLIFIER WILL PERMIT THE HIGHLY EFFICIENT EXCITATION OF ...

    SBIR Phase I 1987 NavyDepartment of DefenseDepartment of Defense
  5. EXPLORATORY DESIGN AND DEVELOPMENT OF A CONSTANT TENSION SPOOLING DEVICE IS PROPOSED.

    Amount: $49,995.00

    EXPLORATORY DESIGN AND DEVELOPMENT OF A CONSTANT TENSION SPOOLING DEVICE IS PROPOSED. SUCH EQUIPMENT PROVIDES SMOOTH TRANSFER OF WIRE ROPE AND ELECTRO-MECHANICAL CABLES FROM SHIPPING SPOOLS ONTO THE S ...

    SBIR Phase I 1986 NavyDepartment of DefenseDepartment of Defense
  6. REACTOR (LMR) STEAM GENERATOR TUBING-

    Amount: $49,928.00

    TO PREVENT THE RELEASE OF RADIONUCLIDES, LIQUID METAL REACTOR (LMR) STEAM GENERATOR TUBING AND THE TUBE-TO- TUBESHEET WELDS HAVE TO FORM A HIGHLY RELIABLE SODIUM- TO-WATER PRESSURE BOUNDARY IN ADDITIO ...

    SBIR Phase I 1985 Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government