  1. TO OBTAIN SPACECRAFT POWER LEVELS GREATER THAN ABOUT 7 KW FOR GEOSYNCHRONOUS ORBIT, IT WILL BE NECESSARY TO REDUCE THE WEIGHT OF THE POWER SYSTEM, PARTICULARLY THE BATTERIES WHICH ARE ESPECIALLY HEAVY.

    Amount: $49,972.00

    TO OBTAIN SPACECRAFT POWER LEVELS GREATER THAN ABOUT 7 KW FOR GEOSYNCHRONOUS ORBIT, IT WILL BE NECESSARY TO REDUCE THE WEIGHT OF THE POWER SYSTEM, PARTICULARLY THE BATTERIES WHICH ARE ESPECIALLY HEAVY ...