NOVATEK

Basic Information

2185 S Larsen Parkway
Provo, UT, 84606

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: n/a


  1. High-Speed 'Hot Chip' Motherboard with Low-Cost High-Pressure Polycrystalline Diamond Heat Spreader.

    Amount: $69,355.00

    N/A

    SBIR Phase I 1999 NavyDepartment of DefenseDepartment of Defense
  2. Development and Testing of a Jet Assisted Polycrystalline Diamond Drilling Bit

    Amount: $750,000.00

    40299 November 12, 1996 Novatek Difficulties in drilling through harder rock formations, particularly as they become fractured, limit the energy resources th ...

    SBIR Phase II 1997 Department of Energy
  3. Very Low Friction Small Radius Domed Cutters for Percussion Drill Bits

    Amount: $750,000.00

    40339 November 12, 1996 Novatek Increasing the rate of penetration of drill bits without increasing the weight on the bit or the torque would increase drilli ...

    SBIR Phase II 1997 Department of Energy
  4. Thermally Stable Polycrystalline Diamond Cutters for Hard Rock Drilling

    Amount: $75,000.00

    41354 November 20, 1996 Novatek Shear bits, also known as drag bits or fixed cutter bits, drill rock substantially faster than roller-cone bits. At present t ...

    SBIR Phase I 1996 Department of Energy
  5. Development and Testing of a Down-hole Mud Actuated Hammer

    Amount: $750,000.00

    N/A

    SBIR Phase II 1996 Department of Energy
  6. Development and Testing of a Jet Assisted Polycrystalline Diamond Drilling Bit

    Amount: $75,000.00

    N/A

    SBIR Phase I 1996 Department of Energy
  7. Very Low Friction Small Radius Domed Cutters for Percussion Drill Bits

    Amount: $75,000.00

    N/A

    SBIR Phase I 1996 Department of Energy
  8. Aggressive, Abrasion-Resistant Cutters for Hard Rock Drill Bits

    Amount: $74,907.00

    N/A

    SBIR Phase I 1995 Department of Energy
  9. Development and Testing of a Down-hole Mud Actuated Hammer

    Amount: $75,000.00

    N/A

    SBIR Phase I 1995 Department of Energy
  10. IMPROVEMENTS IN CHLORINE DIOXIDE DISINFECTION OF WATER

    Amount: $50,000.00

    THE 1986 AMENDMENTS TO THE SAFE DRINKING WATER ACT REQUIRE 99.99 PERCENT INACTIVATION OF GIARDIA. WATER TREATMENT FACILITIES THAT UTILIZE SURFACE WATER WILL HAVE TO USE OZONEOR CHLORINE DIOXIDE TO BE ...

    SBIR Phase I 1990 Department of Health and Human Services

Agency Micro-sites

US Flag An Official Website of the United States Government