OPTELECOM, INC.

Company Information

Company Name
OPTELECOM, INC.
Address
9300 Gaither Road
Gaithersburg, MD, 20877
Phone
1 301-590-2121
URL
n/a
DUNS
72658529
Number of Employees
75
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$607,546.00
12
SBIR Phase II
$2,274,461.00
5

Award List

  1. TWO GENERAL APPROACHES TO FLAT WINDING ARE DISCUSSED.

    Amount: $49,900.00

    TWO GENERAL APPROACHES TO FLAT WINDING ARE DISCUSSED. IN ONE METHOD, THE WINDING SEQUENCE BEGINS BY WINDING THE FIRST LAYER ON A SPIRAL PATTERN INSIDE TO OUT, THEN WINDING THE NEXT LAYER OUTSIDE TO IN ...

    SBIR Phase I 1984 Defense Advanced Research Projects AgencyDepartment of Defense
  2. THE REQUIREMENT FOR ANGLE MEASUREMENT IN THE PRESENCE OF TRANSLATION IS NOT UNCOMMON, YET TRADITIONAL ANGLE ENCODERS DO NOT ACCOMMODATE TRANSLATION, EVEN WHEN THE MEASUREMENT ANGLE IS SMALL.

    Amount: $50,000.00

    THE REQUIREMENT FOR ANGLE MEASUREMENT IN THE PRESENCE OF TRANSLATION IS NOT UNCOMMON, YET TRADITIONAL ANGLE ENCODERS DO NOT ACCOMMODATE TRANSLATION, EVEN WHEN THE MEASUREMENT ANGLE IS SMALL. THE PROPO ...

    SBIR Phase I 1984 NavyDepartment of Defense
  3. THIN BUFFER SINGLE MODE FIBER FOR LONG RANGE FIBER OPTICS GUIDANCE TRANSMISSION

    Amount: $190,397.00

    SEVERAL FACTORS CAN DISTURB THE PERFECTION OF A WINDING AND LIMIT THE LENGTH WHICH CAN WOUND SUCCESSFULLY. THESE FACTORS INCLUDE TEMPERATURE CYCLING OF WOUND SPOOLS, IMPERFECTIONS OR VARIABILITY OF FI ...

    SBIR Phase II 1985 ArmyDepartment of Defense
  4. THE RECENT DEVELOPMENT OF PASSIVE FIBER OPTIC SENSOR SYSTEMS ALLOWS FOR THE FIRST TIME THE ABILITY TO DEVELOP ALL-DIELECTRIC HYDROPHONE ARRAYS.

    Amount: $49,967.00

    THE RECENT DEVELOPMENT OF PASSIVE FIBER OPTIC SENSOR SYSTEMS ALLOWS FOR THE FIRST TIME THE ABILITY TO DEVELOP ALL-DIELECTRIC HYDROPHONE ARRAYS. THESE FIBER OPTIC SENSOR SYSTEMS ALSO HAVE THE POTENTIAL ...

    SBIR Phase I 1985 Defense Advanced Research Projects AgencyDepartment of Defense
  5. MOBILE ROBOT SECURE/AJ DATA LINKS

    Amount: $546,000.00

    THE TECHNOLOGY TO ALLOW REPLACEMENT OF PERSONNEL BY MOBILE ROBOTS IN HIGH RISK SITUATIONS EXISTS TODAY. THE NEAR TERM APPROACH, NOT REQUIRING EXTENSIVE DEVELOPMENT OF ARTIFICIAL INTELLIGENCE REQUIRES ...

    SBIR Phase II 1987 NavyDepartment of Defense
  6. THE TECHNOLOGY TO ALLOW REPLACEMENT OF PERSONNEL BY MOBILE ROBOTS IN HIGH RISK SITUATIONS IS AVAILABLE TODAY.

    Amount: $50,000.00

    THE TECHNOLOGY TO ALLOW REPLACEMENT OF PERSONNEL BY MOBILE ROBOTS IN HIGH RISK SITUATIONS IS AVAILABLE TODAY. THE ROBOTICS APPROACH SUITABLE FOR MOST IMMEDIATE DEPLOYMENT IS TO USE THE ROBOT AS AN EXT ...

    SBIR Phase I 1986 ArmyDepartment of Defense
  7. DEVELOPMENT OF LOW COST RPV COMMUNICATIONS PAYLOADS

    Amount: $493,400.00

    THE PROPOSED PHASE I PROGRAM WILL ANALYZE THE APPLICATION OF TWO NEW COMMUNICATION TECHNOLOGIES ARE (1) PAYING OUT AN OPTICAL FIBER FROM THE RPV AND PROBABLY ALSO SIMULTANEOUSLY FROM A SURFACE SHIP OR ...

    SBIR Phase II 1990 NavyDepartment of Defense
  8. AUTOMATIC ON-LINE HIGH STRENGTH FIBER OPTIC SPLICING

    Amount: $49,845.00

    DEVELOPMENT OF A SYSTEM FOR HIGH STRENGTH FIBER OPTIC SPLICING FOR APPLICATION IN PRECISION SPOOL WINDING FACILITIES IS PROPOSED. PHASE I EFFORT WOULD BE DEVOTED TO LITERATURE REVIEW, SELECTION OF SPL ...

    SBIR Phase I 1987 ArmyDepartment of Defense
  9. COIL WINDING MACHINERY FOR INTERFEROMETRIC FIBER OPTIC GYRO MANUFACTURABILITY

    Amount: $250,309.00

    INTERFEROMETRIC FIBER OPTIC GYRO (IFOG) OPTICAL FIBER COIL WINDINGS ARE PRECISION LEVEL WINDING BETWEEN FLANGES. TO MAKE THESE WINDINGS INSENSITIVE TO THERMAL GRADIENTS ACROSS THE WOUND PACK, THE INNE ...

    SBIR Phase II 1991 Defense Advanced Research Projects AgencyDepartment of Defense
  10. Rapidly Reconfiguring Optical Interconnects

    Amount: $58,176.00

    Missile defense systems for battle management require dense computing for several extremely complex simultaneous information processing requirements. The computation architecture must be highly flexib ...

    SBIR Phase I 1995 Missile Defense AgencyDepartment of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government