Optimization Technology, Inc.

Basic Information

125 West Park Loop Suite 201
Huntsville, AL, 35806

Company Profile

n/a

Additional Details

Field Value
DUNS: 102115136
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 21


  1. Runtime Evaluation and Predicition System (REPS)

    Amount: $744,417.00

    "OTI proposes to research, develop, validate and demonstrate theRuntime Evaluation and Prediction System (REPS) technologiesproviding the runtime prediction capability required in order tomost effecti ...

    SBIR Phase II 2002 Navy Department of Defense
  2. Development of New Processes for the Refurbishment of Infrared Search and Track (IRST) Germanium (Ge) domes

    Amount: $64,409.00

    OTI proposes to research and develop the Runtime Evaluation and Prediction System (REPS) technologies providing the advanced methodology, techniques and integrated tool suite required for the most eff ...

    SBIR Phase I 2001 Navy Department of Defense
  3. N/A

    Amount: $734,522.00

    N/A

    SBIR Phase II 1999 Defense Advanced Research Projects Agency Department of Defense
  4. Large-Scale Distributed / Parallel System Performance Simulation (LDPsim)

    Amount: $95,106.00

    OTI proposes research leading to the construction of a prototype Large Parallel/Distributed system simulation (LDPsim) tool. This tool will provide an automated simulation generation and analysis env ...

    SBIR Phase I 1997 Defense Advanced Research Projects Agency Department of Defense
  5. C4I Distributed Performance Simulation Environment

    Amount: $643,919.00

    Computing and communications requirements to support modern C4I systems have undergone considerable expansion in the last decade. Requirements for C4I interoperability between the services, along with ...

    SBIR Phase II 1996 Air Force Department of Defense
  6. C4I Distributed Performance Simulation Environment

    Amount: $78,836.00

    N/A

    SBIR Phase I 1995 Air Force Department of Defense
  7. AUTOMATED STATE-OF-THE-ART TESTING ENVIRONMENT FOR LARGE-SCALE, REAL-TIME, CONCURRENT/SERIAL, DISTRIBUTED SOFTWARE

    Amount: $59,985.00

    OTI proposes to identify, research, prioritize, select and prove concept feasibility of techniques for testing concurrent, real-time, distributed, large-scale software during Phase I. A prototype proo ...

    SBIR Phase I 1994 Missile Defense Agency Department of Defense
  8. A Comprehensive Approach for Design Complexity Analysis of Avionics Software

    Amount: $49,988.00

    Due to the fairly recent acceptance of software metrics collection techniques, comparative measures of software attributes such as complexity, usability, and quality are not being used for the evaluat ...

    SBIR Phase I 1993 Air Force Department of Defense
  9. A FEASIBILITY AND COST/BENEFIT MODEL FOR ASSEMBLER CONVERSION TO ADA

    Amount: $484,394.00

    DOD GUIDELINES DIRECTING THE USE OF ADA AS THE GOVERNMENT STANDARD PROGRAMMING LANGUAGE WILL RESULT IN MANY EXISTING IMPLEMENTATIONS GRADUALLY BEING CONVERTED TO ADA. AS SOFTWARE UPDATES AND HARDWARE ...

    SBIR Phase II 1991 Navy Department of Defense
  10. A FEASIBILITY AND COST/BENEFIT MODEL FOR ASSEMBLER CONVERSION TO ADA

    Amount: $49,951.00

    N/A

    SBIR Phase I 1988 Navy Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government