PEPIN ASSOC., INC.

Basic Information

P.O. Box 397
Greenville, ME, 04441-0444

Company Profile

Composite Materials R&D

Additional Details

Field Value
DUNS: 623658077
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 2


  1. Hybrid Tailored Preform for Limited Life Airframe Structures

    Amount: $750,785.00

    This Phase II program seeks to develop a low cost high performance keel for the Boeing Unmanned Combat Air Vehicle (UCAV). The preforming concept is based upon a commingled tow, which contains long d ...

    SBIR Phase II 2001 Defense Advanced Research Projects Agency Department of Defense
  2. Hybrid Tailored Preform for Limited Life Airframe Structures

    Amount: $0.00

    This Phase II program seeks to develop a low cost high performance keel for the Boeing Unmanned Combat Air Vehicle (UCAV). The preforming concept is based upon a commingled tow, which contains long d ...

    SBIR Phase I 2001 Defense Advanced Research Projects Agency Department of Defense
  3. N/A

    Amount: $99,992.00

    N/A

    SBIR Phase I 2000 Air Force Department of Defense
  4. LSIT

    Amount: $99,941.00

    N/A

    SBIR Phase I 1996 Department of Health and Human Services
  5. Continuous, High Strenght Hydroxyapatite Fiber

    Amount: $74,966.00

    We will develop a laboratory scale process to fabricate a high strength, continuous hydroxyapa-tite fiber. A hydroxyapatite fiber would find many uses in bone replacement applications; especially bone ...

    SBIR Phase I 1994 Department of Health and Human Services
  6. NOVEL PRECURSOR YARN FOR ADVANCED AUTOMOTIVE COMPOSITE STRUCTURES

    Amount: $500,000.00

    COMPOSITE MATERIALS ARE GAINING WIDER ACCEPTANCE IN BOTH HIGH PERFORMANCE USES SUCH AS DEFENSE/AEROSPACE HARDWARE AND COMMERCIAL, LOW COST USES SUCH AS AUTOMOTIVE, MARINE, AND SPORTING GOODS PRODUCTS. ...

    SBIR Phase II 1991 Department of Energy
  7. NOVEL PRECURSOR YARN FOR ADVANCED AUTOMOTIVE COMPOSITE STRUCTURES

    Amount: $49,798.00

    N/A

    SBIR Phase I 1990 Department of Energy
  8. FIBER REINFORCED STRUCTURES FOR TURBINE ENGINE FRAGMENT CONTAINMENT

    Amount: $320,324.00

    THE PROPOSED PROGRAM EXAMINES OPPORTUNITIES FOR LIGHTWEIGHT CONTAINMENT STRUCTURES IN AIRCRAFT AND ROTORCRAFT AND SEEKS TO DEVELOP FIBER REINFORCED MATERIALS AS THE ENERGY ABSORBING CORE OF POTENTIAL ...

    SBIR Phase II 1989 Department of Transportation
  9. FIBER REINFORCED STRUCTURES FOR TURBINE ENGINE FRAGMENT CONTAINMENT

    Amount: $48,000.00

    N/A

    SBIR Phase I 1988 Department of Transportation

Agency Micro-sites

US Flag An Official Website of the United States Government