Phoenix Integration

Basic Information

VA
Blacksburg, VA, 24060-6472

http://www.phoenix-int.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 938911427
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 40


  1. Integrated Modeling, Analysis, and Verification for Space Missions

    Amount: $124,767.00

    This project will further MBSE technology in fundamental ways by strengthening the link between SysML tools and framework engineering execution environments. Phoenix Integration has produced a commerc ...

    SBIR Phase I 2014 National Aeronautics and Space Administration
  2. Integrated Visualization Environment for Science Mission Modeling

    Amount: $749,942.00

    NASA is emphasizing the use of larger, more integrated models in conjunction with systems engineering tools and decision support systems. These tools place a corresponding stress on legacy engineering ...

    SBIR Phase II 2014 National Aeronautics and Space Administration
  3. Framework for Autonomous Optimization

    Amount: $124,775.00

    Phoenix Integration and MIT propose to create a novel autonomous optimization tool and application programming interface (API). The API will demonstrate the ability to link to many optimization algori ...

    STTR Phase I 2014 National Aeronautics and Space Administration
  4. Integrated Visualization Environment for Science Mission Modeling

    Amount: $124,740.00

    The proposed work will provide NASA with an integrated visualization environment providing greater insight and a more intuitive representation of large technical data sets. Engineering framework tools ...

    SBIR Phase I 2013 National Aeronautics and Space Administration
  5. A Framework for Model Based Decision Making

    Amount: $149,964.00

    ABSTRACT: This proposal seeks to provide a software framework by which a decision maker can participate in complex systems design. It involves building on an already developed engineering integration ...

    SBIR Phase I 2013 Department of DefenseAir ForceDepartment of Defense
  6. Analysis and Design Environment for Large Scale System Models and Collaborative Model Development

    Amount: $749,943.00

    As NASA modeling efforts grow more complex and more distributed among many working groups, new tools and technologies are required to integrate their efforts effectively. This project will build on Ph ...

    SBIR Phase II 2012 National Aeronautics and Space Administration
  7. Analysis and Design Environment for Large Scale System Models and Collaborative Model Development

    Amount: $99,644.00

    Successes to date with the use of integrated software framework tools have led NASA engineers and other researchers to expand the breadth, depth, and sophistication of the problems that they are attem ...

    SBIR Phase I 2011 National Aeronautics and Space Administration
  8. A Practical Model Based Engineering Capability for Integrating Architecture Design, Analysis, and Verification of Large Scale Complex Systems

    Amount: $2,059,469.00

    In the defense industry today, high level SysML system models are used by engineers beginning early in the design process to functionally decompose the system being designed and to flow down requireme ...

    SBIR Phase II 2011 Defense Advanced Research Projects AgencyDepartment of DefenseDepartment of Defense
  9. An Integrated Model Based System Development Capability for Integrating Architecture Design, Analysis, and Verification of Large Scale Complex Systems

    Amount: $98,467.00

    In the defense industry today, high level SysML system models are used by engineers beginning early in the design process to functionally decompose the system being designed and to flow down requireme ...

    SBIR Phase I 2010 Defense Advanced Research Projects AgencyDepartment of DefenseDepartment of Defense
  10. Software Environment for Mission Design, Simulation, and Engineering Data Management

    Amount: $99,756.00

    As NASA designs and develops the next generation of scientific and space exploration vehicles and missions, there is a growing need for a robust, flexible, and easy-to-use software framework that NASA ...

    SBIR Phase I 2009 National Aeronautics and Space Administration

Agency Micro-sites

US Flag An Official Website of the United States Government