Plastronic, Inc.

Company Information

Company Name
Plastronic, Inc.
Address
35 Mary-Bill Dr.
Troy, OH, 45373
Phone
1 937-335-0656
URL
n/a
DUNS
n/a
Number of Employees
3
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$409,892.00
6
SBIR Phase II
$750,000.00
1
STTR Phase I
$0.00
1
STTR Phase II
$500,000.00
1
Chart code to be here

Award List

  1. THERE IS A NATIONAL NEED FOR A LOW CAPITAL EQUIPMENT AND LOW OPERATING COST SURFACE HARDENING PROCESS AS COMPARED TO LASER, ELECTRON BEAM, AND INDUCTION HARDENING.

    Amount: $35,000.00

    THERE IS A NATIONAL NEED FOR A LOW CAPITAL EQUIPMENT AND LOW OPERATING COST SURFACE HARDENING PROCESS AS COMPARED TO LASER, ELECTRON BEAM, AND INDUCTION HARDENING. BY LOWERING THE COST OF SURFACE HARD ...

    SBIR Phase I 1984 National Science Foundation
  2. NEW METHOD FOR IMPROVING THE PRODUCTIVITY OF GAS METAL ARC WELDING AND FLUX CORED ARC WELDING

    Amount: $40,000.00

    CURRENTLY GAS METAL ARC WELDING AND FLUX CORED ARC WELDING HAS THE LIMITATION THAT FOR A GIVEN WIRE DIAMETER, THE PROCESS HAS A GIVEN MINIMUM AND MAXIMUM WIRE FEED SPEED RANGE TO OBTAIN A CONSISTENT S ...

    SBIR Phase I 1987 National Science Foundation
  3. Rapid Quench Nb3Al for High Field Accelerator Applications

    Amount: $750,000.00

    171 Rapid Quench Nb3Al for High Field Accelerator Applications--Plastronic, Inc., 35 Mary-Bill Drive, Troy, OH 45373-1033; (937) 335-0656 Mr. Michael Tomsic, Principal Investigator Mr. Michael Toms ...

    SBIR Phase II 1998 Department of Energy
  4. Rapid Quench Nb3Al for High Field Accelerator Applications

    Amount: $75,000.00

    171 Rapid Quench Nb3Al for High Field Accelerator Applications--Plastronic, Inc., 35 Mary-Bill Drive, Troy, OH 45373-1033; (937) 335-0656 Mr. Michael Tomsic, Principal Investigator Mr. Michael Toms ...

    SBIR Phase I 1997 Department of Energy
  5. High-Strength, Low AC-loss High Temperature Superconductor

    Amount: $59,892.00

    For motor, generator, transformer, and transmission line applications, demonstration projects have been conducted using Bi:2223 high temperature superconductors. There is the desire to use these cond ...

    SBIR Phase I 1997 Missile Defense AgencyDepartment of Defense
  6. N/A

    Amount: $0.00

    N/A

    STTR Phase I 1999 Missile Defense AgencyDepartment of Defense
  7. N/A

    Amount: $500,000.00

    N/A

    STTR Phase II 1999 Missile Defense AgencyDepartment of Defense
  8. Low-Cost Long-Length Manufacturing of Continously Melt-Quenched Processed Fully Stabilized Multifilamentary High-Field Nb3AL Superconductor

    Amount: $100,000.00

    Not Available Increased awareness of health effects caused by airborne contaminants has incurred increased use of various kinds of air filters. However, filters for the specific application as identi ...

    SBIR Phase I 1999 Department of Energy
  9. SBIR Phase I: Non-Vapor Deposition Method for Yttrium Barium Copper Oxide on a Textured Metal Su

    Amount: $100,000.00

    N/A

    SBIR Phase I 1998 National Science Foundation

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government