You are here

PRECISION COMBUSTION, INC.

Company Information
Address
410 SACKETT POINT RD
NORTH HAVEN, CT 06473-3168
United States


https://www.precision-combustion.com

Information

UEI: KHBYLJYZAJP3

# of Employees: 48


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No




Success Stories

  1. SBIR-STTR Success: Precision Combustion, Inc.

    How can one technology change the world? That is one way to look at Precision Combustion, Inc.’s (PCI) strategy for its catalytic reactor technologies.PCI is a clean energy technology company developing and manufacturing advanced performance catalytic reactors and systems for energy and...

Award Charts




Award Listing

  1. A Novel Thermo-Vacuum Microlith Adsorber for TCCS

    Amount: $70,000.00

    The Trace Contaminant Control System (TCCS) used onboard the International Space Station provides for control of trace cabin air contamination originating from materials off-gassing, human metabolism, ...

    SBIRPhase I2002National Aeronautics and Space Administration
  2. Low NOx Catalytic Combustor for Military Aircraft Engines

    Amount: $70,000.00

    "Precision Combustion Inc. (PCI) proposes a novel gas turbine engine fuel injector design that combines catalytic combustion, direct injection and higher airflows through the injector for reducing NOx ...

    SBIRPhase I2002Department of Defense Navy
  3. Methanol Micro Reformer

    Amount: $70,000.00

    "Precision Combustion, Inc. (PCI) proposes to develop a compact methanol reformer based on this Microlith,¿ catalytic reactor technology, capable of delivering 20 ¿V 400 cc/sec of high purity hy ...

    SBIRPhase I2002Department of Defense Army
  4. SBIR/STTR Phase II: Novel Catalyst Substrate for the High and Low Temperature Water Gas Shift Reactor

    Amount: $0.00

    This Small Business Innovation Research Phase II project seeks to develop a compact, lightweight, and low cost Microlith Water Gas Shift (WGS) reactor capable of rapid start-up, excellent transient re ...

    SBIRPhase I2002National Science Foundation
  5. SBIR/STTR Phase II: Novel Catalyst Substrate for the High and Low Temperature Water Gas Shift Reactor

    Amount: $500,000.00

    This Small Business Innovation Research Phase II project seeks to develop a compact, lightweight, and low cost Microlith Water Gas Shift (WGS) reactor capable of rapid start-up, excellent transient re ...

    SBIRPhase II2002National Science Foundation
  6. JP-8 Micro-reformer

    Amount: $99,999.00

    "PCI proposes into topic Area 2 to develop and demonstrate a JP-8 micro-reformer capable of delivering the hydrogen required for a 20 We Solid Oxide Fuel Cell (SOFC) from a catalytic reactor which is ...

    SBIRPhase I2002Department of Defense Office of the Secretary of Defense
  7. SBIR Phase I: Novel Catalyst Substrate for the High and Low Temperature Water Gas Shift Reactor

    Amount: $100,000.00

    This Small Business Innovation Research (SBIR) Phase I project will develop compact Water Gas Shift Reactors (WGSR) with rapid startup and load following through the use of a novel catalyst substrate ...

    SBIRPhase I2001National Science Foundation
  8. N/A

    Amount: $0.00

    N/A

    SBIRPhase I2000National Science Foundation
  9. N/A

    Amount: $400,000.00

    N/A

    SBIRPhase II2000National Science Foundation
  10. N/A

    Amount: $100,000.00

    N/A

    SBIRPhase I2000National Science Foundation
US Flag An Official Website of the United States Government