Pulse Sciences

Basic Information

14796 Wicks Blvd
San Leandro, CA, 94577

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 40


  1. ION FOCUSED MICROWAVE AMPLIFIER

    Amount: $200,000.00

    A NOVEL COMBINATION OF THE NEW TECHNIQUE OF ION FOCUSING AND CONVENTIONAL TRAVELING WAVE TUBE TECHNOLOGY IS PROPOSED. IF SUCCESSFUL, THIS COMBINATION WILL MAKE GIGAWATT AMPLIFIERS IN THE GIGAHERTZ RAN ...

    SBIR Phase II 1987 Air ForceDepartment of DefenseDepartment of Defense
  2. RF ION SOURCE FOR REACTIVE ION BEAM ETCHING

    Amount: $40,000.00

    A VARIETY OF DRY ETCHING PROCESSES HAVE BEEN DEVELOPED FOR USE IN THE MANUFACTURE OF HIGH SPEED, HIGH DENSITY, INTEGRATED SEMICONDUCTOR CIRCUITS. THE RECENT REQUIREMENTS FOR SUBMICRON FEATURE DIMENSIO ...

    SBIR Phase I 1987 National Science Foundation
  3. ADVANCED ACCELERATOR DEVELOPMENT FOR INDUSTRIAL APPLICATIONS-

    Amount: $491,000.00

    THERE ARE NUMEROUS APPLICATIONS FOR ELECTRON-BEAM RADIATION PROCESSING THAT REQUIRE AVERAGE ELECTRON-BEAM POWER LEVELS IN THE MEGAWATT RANGE. THISPOWER IS FIVE TO TEN TIMES GREATER THAN AVAILABLE WITH ...

    SBIR Phase II 1986 Department of Energy
  4. THERE IS A CRITICAL NEED FOR INNOVATIVE CONCEPTS FOR RAPID TUNNELING IN HARD ROCK.

    Amount: $49,882.00

    THERE IS A CRITICAL NEED FOR INNOVATIVE CONCEPTS FOR RAPID TUNNELING IN HARD ROCK. RESEARCH SPONSORED PARTLY BY DNA HAS RECENTLY INDICATED THAT IT MAY BE POSSIBLE TO FORM POWERFUL ELECTRICAL ARCS WITH ...

    SBIR Phase I 1986 Defense Threat Reduction AgencyDepartment of DefenseDepartment of Defense
  5. THE LIMITING ELEMENTS IN INDUCTION ACCELERATOR DESIGN ARE DETERMINED BY THE ACCEPTABLE VOLTAGE GRADIENTS ON KEY DESIGN COMPONENTS.

    Amount: $50,000.00

    THE LIMITING ELEMENTS IN INDUCTION ACCELERATOR DESIGN ARE DETERMINED BY THE ACCEPTABLE VOLTAGE GRADIENTS ON KEY DESIGN COMPONENTS. WE HAVE ANALYZED THE PROBLEM FOR TYPICAL PARAMETERS (250 KV/STAGE, 10 ...

    SBIR Phase I 1986 Defense Advanced Research Projects AgencyDepartment of DefenseDepartment of Defense
  6. EXISTING CATHODE TECHNOLOGY CANNOT PROVIDE THE COMBINATION OF HIGH AVERAGE CURRENT DENSITY AND LONG LIFE THAT IS ESSENTIAL FOR HIGH AVERAGE POWER ACCELERATOR APPLICATIONS.

    Amount: $84,696.00

    EXISTING CATHODE TECHNOLOGY CANNOT PROVIDE THE COMBINATION OF HIGH AVERAGE CURRENT DENSITY AND LONG LIFE THAT IS ESSENTIAL FOR HIGH AVERAGE POWER ACCELERATOR APPLICATIONS. THESE APPLICATIONS INCLUDE H ...

    SBIR Phase I 1986 Defense Advanced Research Projects AgencyDepartment of DefenseDepartment of Defense
  7. ION FOCUSED MICROWAVE AMPLIFIER

    Amount: $78,745.00

    N/A

    SBIR Phase I 1986 Air ForceDepartment of DefenseDepartment of Defense
  8. THE PROJECT IS DESIGN, ANALYZE, AND EVALUATE CIRCUITS AND COMPONENTS THAT WILL GENERATE SPECIALLY SHAPED, HIGH-POWER PULSED WAVEFORMS FOR POWER MULTIPLICATION OR ENERGY-SPECTRUM MODULATION OF CHARGED PARTICLE BEAMS IN LINEAR INDUCTION ACCELERATORS.

    Amount: $49,816.00

    THE PROJECT IS DESIGN, ANALYZE, AND EVALUATE CIRCUITS AND COMPONENTS THAT WILL GENERATE SPECIALLY SHAPED, HIGH-POWER PULSED WAVEFORMS FOR POWER MULTIPLICATION OR ENERGY-SPECTRUM MODULATION OF CHARGED ...

    SBIR Phase I 1985 Department of Energy
  9. ADVANCED ACCELERATOR DEVELOPMENT FOR INDUSTRIAL APPLICATIONS-

    Amount: $49,816.00

    N/A

    SBIR Phase I 1985 Department of Energy
  10. SCANTRON-A HIGH POWER MICRO-WAVE GENERATOR

    Amount: $283,000.00

    LOW VOLTAGE KLYSTRONS ARE RELIABLE AND EFFICIENT (GREATER THAN 30 PERCENT) MICROWAVE AMPLIFIERS, BUT ARE LIMITED TO POWER LEVELS OF 10-20 MW AND ARE DIFFICULT TO SCALE TO HIGHER VOLTAGE DUE TO THE INC ...

    SBIR Phase II 1985 Air ForceDepartment of DefenseDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government