You are here

AN ENVIRONMENTALLY SOUND PROCESS FOR UTILIZING WASTE TIRE-DERIVED FUEL AND RAILROAD-TIE-DERIVED FUEL IN COAL-FIRED STOKER BOILERS

Award Information
Agency: Department of Energy
Branch: N/A
Contract: N/A
Agency Tracking Number: 20994
Amount: $74,872.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 1993
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
77 W 200 S #416
Salt Lake City, UT 84101
United States
DUNS: N/A
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 Dr N Stanley Harding
 (801) 328-6925
Business Contact
Phone: () -
Research Institution
N/A
Abstract

THE UNITED STATES HAS A LARGE BACKLOG OF WASTE TIRES AND RAILROAD TIES, GROWING AT A RATE OF APPROXIMATELY 240 MILLION TIRES/YEAR AND 14 MILLION RAILROAD TIES/YEAR. THESE WASTE FUELS EXPRESENT A SIZABLE RESOURCE. CURRENTLY OVER 80% ARE LANDFILLED, CONSTITUTING LOSS OF A SIGNIFICANT RESOURCE AND CREATING A MAJOR ENVIRONMENTAL PROBLEM. THE OBJECTIVES OF THIS PROJECT ARE TO IDENTIFY BARRIERS TO THE SUCCESSFUL BLENDING OF COAL WITH WASTE TIRES AND RAILROAD TIES IN STOKER-FIRED BOILERS, AND IDENTIFY PROCESS PARAMETERS THAT WILL ENABLE COAL/TIRE-DERIVED FUEL (TDF) AND COAL/RAILROAD-TIE-DERIVED FUEL (RTDF) COMBINATIONS TO PRODUCE TOTAL EMISSIONS WITHIN ENVIRONMENTAL REGULATIONS. IN PHASE I, SERIES OF EXPERIMENTS WILL BE CARRIED OUT IN A PILOT-SCALE STOKER TO ESTABLISH MAXIMUM WASTE TIRE AND RAILROAD TIE REPLACEMENT RATE AS A FUNCTION OF CHIP SIZE; OPTIMUM FEED LOCATION, OVERFIRE/UNDERFIRE AIR RATIO; OPTIMUM GAS/TDF CO-FIRING RATIO (IF NECESSARY); EFFECT OF TDFAND RTDF ON CRITERIA FOR POLLUTANT EMISSIONS, TRACE HYDROCARBONS, PARTICULATE MATTER, AND METALS; AND IMPACT OF TIRE BELTS ON GRATE DUE TO INTERACTION WITH COAL ASH. THIS PROJECT WILL DEFINE THE POTENTIAL FOR COAL/TDF AND COAL/RTDF CO-FIRING BASED ON TECHNICAL PERFORMANCE AND ECONOMIC CONSIDERATIONS ANDWILL ESTABLISH PROCESS DESIGN PARAMETERS THAT WILL BE USED IN THE DESIGN OF AN OPTIMM COAL/TDF OR COAL/RTDF STOKER SYSTEM. IN ADDITION, THE PROJECT WILL DOCUMENT ADVANTAGES TO THE INDUSTRIAL CUSTOMER THAT RESULT FROM COFIRING.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government