REINHART & ASSOC., INC.

Company Information

Company Name
REINHART & ASSOC., INC.
Address
PO Box 9802-303
Austin, TX, 78766
Phone
n/a
URL
n/a
DUNS
n/a
Number of Employees
16

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$350,000.00
6
SBIR Phase II
$729,493.00
1
Chart code to be here

Award List

  1. RADIOGRAPHIC LAYER COUNTER FOR COMPOSITES

    Amount: $50,000.00

    THE ARMY BALLISTIC HELMET IS A COMPOSITE CONSISTING OF 19 RESINBONDED KELVAR. IT IS TYPICALLY LAID UP IN A PINWHEEL AND CROWN PLY CONFIGURATION. INADVERTANT OMISSION OF LAYERS OR UNDETECTED SHIFTING O ...

    SBIR Phase I 1987 ArmyDepartment of Defense
  2. PROGRAMMABLE REFLECTANCE OF ARTIFICIAL FLAWS IN RAIL MATERIALS

    Amount: $50,000.00

    A PROGRAMMABLE DEFECT SIMULATOR IS NEEDED TO TEST ULTRASONIC RAIL FLAW DETECTION SYSTEMS. CALIBRATION STANDARDS CAN BE DEVELOPED WITH VARIABLE PHYSICAL CHARACTERISTICS ACCORDING TO A PREDESCRIBED SCHE ...

    SBIR Phase I 1987 Department of Transportation
  3. FORCE REFLECTION EFFECTS ON OPERATOR PERFORMANCE OF REMOTE MAINTENANCE AND INSPECTION SYSTEMS FOR NUCLEAR FACILITIES

    Amount: $50,000.00

    ROBOTIC MACHINES THAT DUPLICATE THE MANIPULATIVE SKILLS OF AHUMAN OPERATOR ARE CRITICALLY NEEDED IN COMMERCIAL NUCLEAR POWER PLANTS TO REDUCE OPERATOR EXPOSURE IN HIGH-RADIATION AREAS. ROBOTIC SYSTEMS ...

    SBIR Phase I 1987 Department of Energy
  4. ACOUSTIC METHODS FOR STRESS MEASUREMENTS IN STRUCTURES

    Amount: $50,000.00

    PREDICTION OF CATASTROPHIC AND COSTLY FAILURES IN STRUCTURALCOMPONENTS HAS BEEN HAMPERED BY THE INABILITY TO MEASURE STRESS LEVELS IN CRITICAL COMPONENTS WITH ACCURACY. THIS PROPOSAL DESCRIBES THE STE ...

    SBIR Phase I 1988 National Science Foundation
  5. SURFACE RESIDUAL STRESS ANALYSIS OF METALS AND ALLOYS

    Amount: $50,000.00

    PREDICTION OF CATASTROPHIC AND COSTLY FAILURE IN STRUCTURAL COMPONENTS HAS BEEN HAMPERED BY THE INABILITY TO MEASURE STRESS LEVELS IN CRITICAL COMPONENTS WITH ACCURACY. THIS PROPOSAL DESCRIBES THE STE ...

    SBIR Phase I 1990 NavyDepartment of Defense
  6. Automated Long Taper Hone

    Amount: $729,493.00

    The prototype of an automated computer controlled precision hone will be built and evaluated in Phase I. The prototype hone will evaluate in situ bore measurement as a means to reduce the overall tim ...

    SBIR Phase II 1998 Air ForceDepartment of Defense
  7. Automated Long Taper Hone

    Amount: $100,000.00

    The prototype of an automated computer controlled precision hone will be built and evaluated in Phase I. The prototype hone will evaluate in situ bore measurement as a means to reduce the overall tim ...

    SBIR Phase I 1997 Air ForceDepartment of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government