Remotec Inc.

Basic Information

114 Union Valley Rd
Oak Ridge, TN, 37830

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: n/a


  1. ENVIRONMENTAL HARDENING OF A MOBILE-MANIPULATOR ROBOTIC SYSTEM FOR NUCLEAR ENVIRONMENTS

    Amount: $499,978.00

    THIS PROJECT INVOLVES THE DEVELOPMENT OF A MOBILE ROBOT SYSTEM THAT CAN WITHSTAND VERY HIGH LEVELS OF RADIATION AND VERY HIGH TEMPERATURES. ALTHOUGH MANY ROBOT SYSTEMS ARE PRESENTLY AVAILABLE, NONE CA ...

    SBIR Phase II 1993 Department of Energy
  2. ENVIRONMENTAL HARDENING OF A MOBILE-MANIPULATOR ROBOTIC SYSTEM FOR NUCLEAR ENVIRONMENTS

    Amount: $50,000.00

    N/A

    SBIR Phase I 1992 Department of Energy
  3. AN ADVANCED ROBOTIC MANIPULATOR FOR THE INTEGRAL FAST REACTOR FUEL CYCLE FACILITY

    Amount: $494,000.00

    DEMONSTRATION TESTING OF ADVANCED PROCESS EQUIPMENT IS EXPECTED TO CONFIRM THE FEASIBILITY OF THE INTEGRAL FAST REACTOR (IFR) FUEL CYCLE PROCESS AT THE HOT FUEL EXAMINATION FACILITY - SOUTH (HFEF-S) O ...

    SBIR Phase II 1990 Department of Energy
  4. AN ADVANCED ROBOTIC MANIPULATOR FOR THE INTEGRAL FAST REACTOR FUEL CYCLE FACILITY

    Amount: $49,887.00

    N/A

    SBIR Phase I 1989 Department of Energy
  5. AN IN-VESSEL MANIPULATOR CONCEPT DEMONSTRATION FOR THE COMPACT IGNITION TOKAMAK

    Amount: $494,000.00

    THE SPECIALIZED CONFIGURATION OF THE CTT (COMPACT IGNITION TOKAMAK) PLASMA CHAMBER WITH ITS LIMITED ACCESS SPACE, HIGH RADIATION LEVELS, AND HIGH VACUUM CONDITIONS REQUIRES THE DEVELOPMENT OF SPECIAL ...

    SBIR Phase II 1988 Department of Energy
  6. AN IN-VESSEL MANIPULATOR CONCEPT DEMONSTRATION FOR THE COMPACT IGNITION TOKAMAK

    Amount: $49,823.00

    N/A

    SBIR Phase I 1987 Department of Energy
  7. A REACTOR CAVITY INSPECTION ROBOT-

    Amount: $196,000.00

    A ROBOTIC INSPECTION SYSTEM WILL BE DEVELOPED TO ELIMINATE THE NEED FOR WORKER ENTRY INTO REACTOR CAVITIES AT PRESSURIZED WATER REACTOR (PWR) PLANTS. CURRENTLY, WORKERS MUST ENTER THE CAVITY TO LOOK F ...

    SBIR Phase II 1986 Department of Energy
  8. EVALUATION OF ROBOTICS FOR FLANGE BOLTING

    Amount: $225,000.00

    ALL FUSION MACHINE CONCEPTS HAVE ADOPTED A MAINTENANCE PHILOSOPHY FOR REMOVING AND REPLACING OF FAILED COMPONENTS IN ORDER TO MINIMIZE MACHINE DOWNTIME FOR REPAIR. MANY COMPONENTS ARE CONNECTED TO THE ...

    SBIR Phase II 1986 Department of Energy
  9. THE CONCEPTUAL DESIGN OF A LOW COST MOBILE ROBOT WILL BE PREPARED UTILIZING PROVEN AND EXISTING TECHNOLOGY AND COMPONENT.

    Amount: $49,332.00

    THE CONCEPTUAL DESIGN OF A LOW COST MOBILE ROBOT WILL BE PREPARED UTILIZING PROVEN AND EXISTING TECHNOLOGY AND COMPONENT. REQUIREMENTS WILL BE ESTABLISHED BY SURVEYING POTENTIAL EDUCATIONAL AND LABORA ...

    SBIR Phase I 1986 Defense Advanced Research Projects Agency Department of Defense
  10. A REACTOR CAVITY INSPECTION ROBOT-

    Amount: $49,642.00

    N/A

    SBIR Phase I 1985 Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government