Stratton Composite Solutions

Company Information

Company Name
Stratton Composite Solutions
Address
865 Chestnut Lake Dr
Marietta, GA, -
Phone
1 404-840-3530
URL
n/a
DUNS
127200124
Number of Employees
3

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$399,801.00
4
SBIR Phase II
$749,550.00
1
STTR Phase I
$69,904.00
1
Chart code to be here

Award List

  1. Lightweight Layered Protection Systems for Missile Launchers and Canisters

    Amount: $69,904.00

    A major objective in the design of Navy missile systems is to protect its high value missile and ship assets and lives of personnel from an explosion of the missile due to threats during transportatio ...

    STTR Phase I 2010 NavyDepartment of Defense
  2. Encapsulated Resin for Non-Autoclave Resin Film Infusion Composites Repair

    Amount: $99,870.00

    A new process for repair of composites will be developed for BMI materials. This process will solve the problems associated with Film Infusion by allowing for air evacuation before cure. Material wi ...

    SBIR Phase I 2004 Air ForceDepartment of Defense
  3. Encapsulated Resin for Non-Autoclave Resin Film Infusion Composites Repair

    Amount: $749,550.00

    Given the importance of composite repair to new aircraft like the F/A-22 and F-35 this SBIR research will provide significant improvement to the warfighter. The development of a powder resin, and dr ...

    SBIR Phase II 2005 Air ForceDepartment of Defense
  4. Improved Manufacturing Technologies for Polymer Matrix Composite Engine Components

    Amount: $99,963.00

    Bagging of high temperature composites continues to be difficult becuase the Kapton material that is used is not elastic at any temperature. This inelasticity causes bages to bridge and break. There ...

    SBIR Phase I 2006 Air ForceDepartment of Defense
  5. Manufacturing Structures in a Limited Production Environment

    Amount: $99,970.00

    Risk and Cost are the primary roadblocks to insertion of new structures technologies. The risk going through the design changes, tooling the part, fabricating the part and testing the part can prove ...

    SBIR Phase I 2006 Air ForceDepartment of Defense
  6. Novel Analytical and Experimental Methods for Evaluating Bolted Joint Repairs in Composite Structure

    Amount: $99,998.00

    In today"s composite aircraft structures, bolted joints are frequently subject to abuse, overloads, heat damage, or lightning strikes which can damage both the fastener and the surrounding compos ...

    SBIR Phase I 2011 Department of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government