SOFTWARE TIMING/RELIABILITY WORKSTATION (STRW) DEVELOPMENT

Award Information
Agency: Department of Defense
Branch: Navy
Contract: N/A
Agency Tracking Number: 6376
Amount: $49,981.00
Phase: Phase I
Program: SBIR
Awards Year: 1987
Solicitation Year: N/A
Solicitation Topic Code: N/A
Solicitation Number: N/A
Small Business Information
Sci-so Inc
Po Box 25446, Albuquerque, NM, 87125
DUNS: N/A
HUBZone Owned: N
Woman Owned: N
Socially and Economically Disadvantaged: N
Principal Investigator
 DR ROBERT M WESSELY
 (505) 265-7641
Business Contact
Phone: () -
Research Institution
N/A
Abstract
TIMING/RELIABILITY ASPECTS OF SYSTEM MUST BE ADDRESSED AT ALL LEVELS IN THE DEVELOPMENT OF TACTICAL REAL-TIME SOFTWARE SYSTEMS. IT IS PARTICULARLY IMPORTANT THAT TACTICAL SITUATION OVERLOADING, UNDERLOADING, AND GRACEFUL DEGREDATION BE ANALYZED AND EVALUATED EARLY IN A SYSTEM DEVELOPMENT CYCLE. SCI-SO HAS PROPOSED A PHASE I PROGRAM TO INITIATE THE DEVELOPMENT OF A SOFTWARE TIMING/RELIABILITY WORKSTATION (STRW) AS A SYSTEM TIMING PARAMETER/ATTRIBUTE ANALYSIS, DEFINITION, AND VALIDATION TOOL TO MEET THIS URGENT NEED. DURING PHASE I, SCI-SO PROPOSES TO ESTABLISH AN OPERATIONAL SCENARIO FOR THE STRW, THEN IDENTIFY, ANALYZE, AND SELECT A COMPATABLE FAMILY OF STRW FEATURES, AND, FINALLY, TO DOCUMENT THE EVOLVING STRW IN A SYSTEM LEVEL SPECIFICATION. SCI-SO BELIEVES THAT THE PROPOSED PHASE I PROGRAM WILL CONFIRM THE FEASIBILITY AND DESIRABILITY OF THE STRW AND WILL PROVIDE AN EXCELLENT FOUNDATION ON WHICH A PHASE II EFFORT CAN BE INITIATED TO CONTINUE STRW DEVELOPMENT.

* information listed above is at the time of submission.

Agency Micro-sites

US Flag An Official Website of the United States Government