Sea Tech Inc.

Basic Information

Po Box 779
Corvallis, OR, 97339

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 10


  1. DEVELOPMENT OF AN EXPENDABLE PARTICLE SENSOR

    Amount: $500,000.00

    IN ORDER TO BE ABLE TO RAPIDLY ASSESS THE THREE DIMENSIONAL STRUCTURE OF PARTICULATE MATTER IN THE SEA, WE PROPOSE TO DEVELOP AN EXPENDABLE PARTICLE SENSOR. THE PARTICLE SENSOR WILL HAVE SUFFICIENT RE ...

    SBIR Phase II 1991 Navy Department of Defense
  2. CALIBRATION OF IN SITU OPTICAL DEVICES USING A PURE WATER STANDARD

    Amount: $268,171.00

    PRESENTLY, SPECTRAL CALIBRATION OF INSTRUMENTS USED TO STUDYTHE OPTICAL PROPERTIES OF WATER IS VERY DIFFICULT TO ACCOMPLISH. FREQUENTLY, IN FACT, RELATIVE MEASUREMENTS MUSTBE MADE RATHER THAN ABSOLUTE ...

    SBIR Phase II 1990 Department of Energy
  3. DEVELOPMENT OF A SPECTRAL ATTENUATION METER AND A SPECTRAL BACK SCATTERING METER

    Amount: $499,830.00

    THIS PROJECT WILL DESIGN, CONSTRUCT, AND EVALUATE PROTOTYPE SPECTRAL ATTENUATION AND BACKSCATTERING METERS. THESE INSTRUMENTS, ALONG WITH A SPECTRAL ABSORPTION METER CURRENTLY BEING DEVELOPED, ARE NEE ...

    SBIR Phase II 1990 Department of Energy
  4. DEVELOPMENT OF AN EXPENDABLE PARTICLE SENSOR

    Amount: $50,000.00

    N/A

    SBIR Phase I 1990 Navy Department of Defense
  5. DEVELOPMENT OF A SPECTRAL ATTENUATION METER AND A SPECTRAL BACK SCATTERING METER

    Amount: $50,000.00

    N/A

    SBIR Phase I 1989 Department of Energy
  6. CALIBRATION OF IN SITU OPTICAL DEVICES USING A PURE WATER STANDARD

    Amount: $50,000.00

    N/A

    SBIR Phase I 1989 Department of Energy
  7. AN OPTICAL FEEDBACK BASED HIGH ACCURACY BEAM TRANSMISSOMETER DEVELOPMENT

    Amount: $126,000.00

    A LIGHT SOURCE WILL BE DEVELOPED USING OPTICAL FEEDBACK, AND WILL BE INCORPORATED INTO A LIGHT BEAM TRANSMISSOMETER TO DEVELOP A PROTOTYPE FOR EVENTUAL PRODUCTION OF A HIGH ACCURACY, WAVELENGTH SELECT ...

    SBIR Phase II 1987 Navy Department of Defense
  8. DEVELOPMENT OF A PROTOTYPE MONOCHROMATIC IN SITU LIGHT ABSORPTION METER.

    Amount: $40,000.00

    AN INSTRUMENT WILL BE DEVELOPED FOR THE IN SITU MEASUREMENT OF ABSORPTION OF 670 NM WAVELENGTH LIGHT BY MARINE PARTICLES. THE INSTRUMENT WILL MAKE USE OF A LARGE AREA DETECTOR AND A REFLECTING TUBE AL ...

    SBIR Phase I 1987 National Science Foundation
  9. AN OPTICAL FEEDBACK BASED HIGH ACCURACY BEAM TRANSMISSOMETER DEVELOPMENT

    Amount: $49,860.00

    N/A

    SBIR Phase I 1986 Navy Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government