Advanced Truck for High Speed Freight Operations

Award Information
Agency:
Department of Transportation
Branch
n/a
Amount:
$605,175.00
Award Year:
2004
Program:
SBIR
Phase:
Phase II
Contract:
DTRS5704C10023
Award Id:
51538
Agency Tracking Number:
DTRS57-02-C-10024
Solicitation Year:
n/a
Solicitation Topic Code:
n/a
Solicitation Number:
n/a
Small Business Information
Sharma & Associates, Inc. (Currently Sharma & Associates Inc.)
5810 South Grant Street, Hinsdale, IL, 60521
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N
Duns:
884551540
Principal Investigator:
Vinaya Sharma
(630) 655-4630
Business Contact:
Vinaya Sharma
(630) 655-4630
Research Institution:
n/a
Abstract
During Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Vehicle dynamics simulations performed as part of Phase I indicate that the concept truck can travel at 150mph prior to the onset of lateral instability (hunting). The concept trucks also performed well in the other Chapter XI test regimes indicating track worthiness at lower speeds. The primary objective of Phase II of the project is to develop the truck concept into a detailed, practical and track-worthy design that can be prototyped and built for successful over-the-road or Chapter XI testing. A secondary objective is to produce prototypes of its key componenets for additional testing/evaluation. As part of this process, we will conduct additional vehicle dynamics analysis to ensure that the truck performs well under a wide range of scenarios including worn conditions. The most practical methods to achieve the desired suspension characteristics will be determined and the necessary details specified. It is expected that the concepts developed will provide the required safety and track worthiness required for high speed operation.

* information listed above is at the time of submission.

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government