Shenandoah Mountain

Company Information

Company Name
Shenandoah Mountain
Address
1011 Arlington Blvd., S-723
Arlington, VA, 22209
Phone
n/a
URL
n/a
DUNS
n/a
Number of Employees
n/a

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$399,070.00
6
SBIR Phase II
$954,977.00
3
Chart code to be here

Award List

  1. AND MAGNETOMETER DATA

    Amount: $260,000.00

    MINE HUNTING WITH SIDE SCAN SONARS AND MAGNETOMETERS IS PROVING TO BE A LOW COST MEANS OF LOCATING MINES AND MINE-LIKE OBJECTS ON THE OCEAN BOTTOM. IT IS ALSO THE MOST EFFECTIVE MEANS OF PRECISELY CHA ...

    SBIR Phase II 1985 NavyDepartment of Defense
  2. COST REDUCTION HAS DRIVEN THE INCREASED USE OF LARGE CARGO CARRIERS (LCC'S) IN MARITIME TRANSPORATION.

    Amount: $50,000.00

    COST REDUCTION HAS DRIVEN THE INCREASED USE OF LARGE CARGO CARRIERS (LCC'S) IN MARITIME TRANSPORATION. THE LCC'S INCREASED DRAFT, BEAM AND LENGTH ARE WELL RECOGNIZED, BUT THE PROPORTIONATE INCREASED H ...

    SBIR Phase I 1986 Department of Transportation
  3. LASER RANGING SENSOR FOR WATER LEVEL MONITORING

    Amount: $195,000.00

    THE U.S. ARMY CORPS OF ENGINEERS (COE) OPERATES A LARGE NUMBER OF GAGES TO MEASURE AND MONITOR CHANGES IN TIDE AND WATER LEVELS. THESE GAGES ACQUIRE ESSENTIAL DATA FOR HYDROLOGICAL STUDIES, HYDROGRAPH ...

    SBIR Phase II 1988 ArmyDepartment of Defense
  4. FAULT TOLERANT INTEGRATED NAVIGATION SYSTEM DEVELOPMENT PROGRAM

    Amount: $49,492.00

    THE TOP LEVEL DESIGN AND SIMULATION OF A FAULT TOLERANCE, FAIL-SOFT INTEGRATED NAVIGATION SYSTEM IS PROPOSED. THE PROPOSED ARCHITECTURE CONSISTS OF A RING LASER GYRO, CORRELATION VELOCITY SPEED LOG, H ...

    SBIR Phase I 1989 NavyDepartment of Defense
  5. Mission Adaptable Control Strategies for a Resiliant Unmanned Underseas Vehicle (UUV) Control System

    Amount: $70,000.00

    An adaptive, intelligent control strategy is an essential element in the development of tactical UUV's designed for real-world missions and use by Fleet personnel rather--than scientists. This str ...

    SBIR Phase I 1996 NavyDepartment of Defense
  6. N/A

    Amount: $499,977.00

    N/A

    SBIR Phase II 1999 Department of Transportation
  7. AND MAGNETOMETER DATA

    Amount: $82,210.00

    N/A

    SBIR Phase I 1983 NavyDepartment of Defense
  8. LASER RANGING SENSOR FOR WATER LEVEL MONITORING

    Amount: $50,000.00

    N/A

    SBIR Phase I 1987 ArmyDepartment of Defense
  9. High Resolution Data Sources and Applications for Transportation Planning

    Amount: $97,368.00

    N/A

    SBIR Phase I 1997 Department of Transportation

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government