System Technology Associates, Inc.

Company Information

Company Name
System Technology Associates, Inc.
Address
120 Holmes Ave Ne
Suite 401
Huntsville, AL, -
Phone
1 256-656-8613
URL
n/a
DUNS
794784132
Number of Employees
4
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$358,753.00
4
SBIR Phase II
$1,624,362.00
2
Chart code to be here

Award List

  1. End-to-End BMDS Interceptor / Ground Terminal Communication Links

    Amount: $874,362.00

    The System Technology Associates, Inc. (STAI) Phase I End to End Communication Test Bed- Tool Set Architecture supports a growth path within the President's decision to enhanced missile defense protec ...

    SBIR Phase II 2010 Missile Defense AgencyDepartment of Defense
  2. Missile System Operations Control System Technology Investigation

    Amount: $70,000.00

    Great strides have been made in ground launched missile system range, firepower, speed, size, accuracy, and maneuverability through the use of sophisticated technologies. Many of these new systems re ...

    SBIR Phase I 1995 ArmyDepartment of Defense
  3. IFICS Data Processing for Ground-based Midcourse Defense (GMD)

    Amount: $89,625.00

    The project Work Plan will incorporate software and sensor technology developments in the general technology areas of Sensors, Decision Science and Computer Science in a Predictive Maintenance archite ...

    SBIR Phase I 2005 Missile Defense AgencyDepartment of Defense
  4. IFICS Data Processing for Ground-based Midcourse Defense (GMD)

    Amount: $750,000.00

    The contractor proposes to design, build and test a Predictive Maintenance Unit (PMU). The PMU is modular maintenance product that detects hardware failures before they happen and cause a mission fail ...

    SBIR Phase II 2006 Missile Defense AgencyDepartment of Defense
  5. End-to-End BMDS Interceptor / Ground Terminal Communication Links

    Amount: $99,952.00

    This is a place holder. It is the new paradigm of Architectural Health Monitoring that offers the promise of increased probability of message delivery reliability in a hostile wartime environmen ...

    SBIR Phase I 2009 Missile Defense AgencyDepartment of Defense
  6. Long-Term Missile Aging Reliability Prediction for Advanced Platforms

    Amount: $99,176.00

    GMD weapon elements have been developed primarily from test elements which have been modified through time, Politics, Budgets, Missions, technological advances to become the fielded defense system. G ...

    SBIR Phase I 2012 Department of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government