Tec-Masters, Inc.

Basic Information

1500 Perimeter Pkwy, Suite 320
Huntsville, AL, 35806-0352

Company Profile

n/a

Additional Details

Field Value
DUNS: 618735948
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 277


  1. Application of Advanced Radiation Shielding Materials to Inflatable Structures

    Amount: $99,321.00

    This innovation is a weight-optimized, inflatable structure that incorporates radiation shielding materials into its construction, for use as a habitation module or rover vehicle. An inflatable fabric ...

    SBIR Phase I 2010 National Aeronautics and Space Administration
  2. Radiation Shielding Using Thermally Insulating Spheres

    Amount: $69,780.00

    The design of future habitation structures and exploration vehicles will require a higher level of crew protection from dangerous solar particle events (SPE) and galactic cosmic rays (GCR) than is cur ...

    SBIR Phase I 2005 National Aeronautics and Space Administration
  3. Discrimination Via Phased Derived Range

    Amount: $749,964.00

    The Phased Derived Range (PDR) method generates higher resolution object features than current radar processing methods, making available more physics based features for discrimination. These new phys ...

    SBIR Phase II 2004 Missile Defense Agency Department of Defense
  4. Data Modeling Enabled Real Time Image Processing For Target Discrimination

    Amount: $69,998.00

    Image processing algorithms potentially contribute information that is not currently extracted from missile passive IR sensors measurements. These algorithms must be fast running and robust to work wi ...

    SBIR Phase I 2003 Missile Defense Agency Department of Defense
  5. Discrimination Via Phased Derived Range

    Amount: $69,997.00

    "Discrimination Via Phased Derived RangeDiscrimination of threat reentry vehicles (RVs) from debris, heavy replicas, and other penetration aids can be achieved by forming a radar image of the target. ...

    SBIR Phase I 2002 Missile Defense Agency Department of Defense
  6. Solution-Adaptive Transient Crystal Growth Model

    Amount: $69,997.00

    N/A

    SBIR Phase I 1995 National Aeronautics and Space Administration
  7. REQUIREMENTS ENGINEERING METHODOLOGY AND TECHNIQUES

    Amount: $496,017.00

    A NEW APPROACH TO SOFTWARE SPECIFICATION ANALYSIS WHEREBY THE MODIFICATIONS ARE ANNOTATED USING ALGORITHMS WHICH AUTOMATE THE PROCESS OF IDENTIFYING CHANGES. THE AUTOMATED SYSTEM WOULD SYNTACTICALLY A ...

    SBIR Phase II 1992 Army Department of Defense
  8. REQUIREMENTS ENGINEERING METHODOLOGY AND TECHNIQUES

    Amount: $47,570.00

    N/A

    SBIR Phase I 1990 Army Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government