Techno-Sciences, Inc.

Basic Information

11750 Beltsville Drive
3rd Floor
Beltsville, MD, -

http://www.technosci.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 61997029
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 75


  1. High Fidelity Helicopter Lag Damper Model for Comprehensive Rotor Analysis

    Amount: $749,829.00

    The primary goal of this STTR program is to develop high fidelity LDLP software module that can predict stiffness and damping forces over the ranges of amplitude, frequency, and temperature appropriat ...

    STTR Phase II 2013 Department of Defense Navy
  2. Aircraft Energy Management

    Amount: $149,987.00

    ABSTRACT: Traditional military aircraft design has been based on peak power and peak thermal loads. With the introduction of more-electric aircraft, increasing requirements for on-demand high-quality ...

    SBIR Phase I 2013 Department of Defense Air Force
  3. Intelligent Charge Control System w/Anti-Idle to Minimize Fuel Consumption

    Amount: $99,967.00

    Fuel is the second-highest battlefield throughput commodity behind water. In fact, ~65% of the fuel consumed in the theatre is for fuel transportation to the battlefield. To improve the fuel consumpti ...

    SBIR Phase I 2013 Army Department of Defense
  4. ASP Motion Base for Stabilized Mounts

    Amount: $99,938.00

    Several military helicopters feature forward firing weapons, which have simple and reliable mounts, but require the pilot to precisely point the aircraft at an intended target. Depending on the combat ...

    SBIR Phase I 2012 Department of Defense Army
  5. Plasmonic nanowire solar shades

    Amount: $99,979.00

    Solar shading is a cost-effective solution in expeditionary shelters for reducing fuel consumption for climate control. Current solar shades are known to typically fail by fabric tearing in the degrad ...

    SBIR Phase I 2012 Department of Defense Army
  6. Intelligent Sensor Fusion for Shipboard Auxiliary Systems

    Amount: $79,947.00

    Data analysis and sensor fusion is undeniably the most pertinent part of science and practical applications related to information management for damage detection and condition monitoring. Unfortunate ...

    SBIR Phase I 2012 Department of Defense Navy
  7. Smart Power Load-Leveling Control for Energy Efficient, Advanced Distribution Systems

    Amount: $599,835.00

    The primary goal of this project is to develop a set of design tools for the development of next generation power and load management strategies and devices to integrate distributed generation and loa ...

    SBIR Phase II 2012 Navy Department of Defense
  8. Self Powered, Submarine Emergency Position Indicating Radio Beacon (SEPIRB)

    Amount: $749,985.00

    High technology small business Techno-Sciences, Inc. in partnership with Submarine Emergency Position Indicating Radio Beacon (SEPIRB) manufacturer Ultra Electronic Ocean Systems Inc. proposes the dev ...

    SBIR Phase II 2012 Department of Defense Navy
  9. Development of a clinical robotic device for diagnosis, rehabilitation and treatm

    Amount: $95,958.00

    DESCRIPTION (provided by applicant): Anterior Cruciate Ligament (ACL) injury afflicts at least 200,000 young Americans annually. At least, 50 percent of individuals develop Osteoarthritis (OA) in ...

    SBIR Phase I 2011 Department of Health and Human Services
  10. High Fidelity Helicopter Lag Damper Model for Comprehensive Rotor Analysis

    Amount: $149,881.00

    Rotors and their associated dynamic components operate in high-cycle and environmentally harsh conditions. Accurate rotor load predictions are crucial part of rotor analysis and design. Lag damping po ...

    STTR Phase I 2011 Navy Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government