DEVELOPMENT OF A RESIDUAL IN-SITU STRESS GAUGE

Award Information
Agency:
Department of Defense
Amount:
$158,808.00
Program:
SBIR
Contract:
N/A
Solitcitation Year:
N/A
Solicitation Number:
N/A
Branch:
Defense Threat Reduction Agency
Award Year:
1991
Phase:
Phase II
Agency Tracking Number:
15364
Solicitation Topic Code:
N/A
Small Business Information
Terra Tek Inc.
Univeristy Research Park 400, Wakara Way, Salt Lake City, UT, 84108
Hubzone Owned:
N
Woman Owned:
N
Socially and Economically Disadvantaged:
N
Duns:
N/A
Principal Investigator
 Dr Conrad W Felice
 Principal Investigator
 (801) 584-2475
Business Contact
Phone: () -
Research Institution
N/A
Abstract
QUANTITATIVE VERIFICATION OF THE RESIDUAL IN-SITU STRESS FIELD WHICH CREATES THE CONTAINMENT CAGE IS NEEDED TO ASSESS THE FACTOR OF SAFETY AGAINST HYDRAULIC FRACTURING FROM THE CAVITY WALL. PHASE I WILL ESTABLISH THE FEASIBLITY OF DEVELOPING A PASSIVE STRESS GAUGE, ABSENT OF ACTIVE INSTRUMENTATION, AND CAPABLE OF RECORDING THE RESIDUAL IN-SITU STRESS FIELD IMMEDIATELY FOLLOWING THE NUCLEAR DEVICE DETONATION FOR A DURATION OF A FEW MINUTES. THE GAUGE COMPONENTS WILL BE FABRICATED AND EXTENSIVELY TESTED UNDER SIMULATED TEST CONDITIONS. THE GAUGE WILL THEN BE ASSEMBLED AND VERIFIED AS A WHOLE UNDER SIMULATED TEST CONDITIONS. THIS WILL LAY THE BASIS FOR A PHASE II EFFORT WHICH WOULD CONSIST OF BUILDING SEVERAL GAUGES FOR DEPLOYMENT IN A NUCLEAR TEST AT THE NEVADA TEST SITE.

* information listed above is at the time of submission.

Agency Micro-sites

US Flag An Official Website of the United States Government