TRITEC SYSTEMS, INC.

Company Information

Company Name
TRITEC SYSTEMS, INC.
Address
4825 University Square, Suite 7
Huntsville, AL, -
Phone
1 256-726-0154
URL
n/a
DUNS
21685263
Number of Employees
3

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$539,223.00
6
SBIR Phase II
$2,499,403.00
2
Chart code to be here

Award List

  1. Phasing Multiple High Power Impulse RF Sources

    Amount: $69,600.00

    The proposed research will investigate the application of Metamaterial-based Ferro-Electric Phasing Elements (MPE) into a universal impulse synchronization technology that is independent of the HPM im ...

    SBIR Phase I 2010 ArmyDepartment of Defense
  2. Innovative Hardware Technologies for Anti-Jam and Electromagnetic Attack Rejection in Ballistic Missile Defense System (BMDS) Radars

    Amount: $99,830.00

    The Branch Line Filter (BLF) will use chaotically generated fractal structures to couple with a chaotic jammer signal and not a desired radar return. During this effort, a branch line filter will be ...

    SBIR Phase I 2008 Missile Defense AgencyDepartment of Defense
  3. Advanced Ferroelectric Materials for Explosive Pulsed Power for Missiles and Munitions

    Amount: $69,971.00

    Polarized-Cast Saturated Polymer (PCSP) FEG working bodies will use state-of-art ferroelectric materials such as PZT 95/5 to demonstrate their first order device characteristics. During this effort, ...

    SBIR Phase I 2008 ArmyDepartment of Defense
  4. Innovative Hardware Technologies for Anti-Jam and Electromagnetic Attack Rejection in Ballistic Missile Defense System (BMDS) Radars

    Amount: $99,825.00

    The Pseudo-Metamaterial Limiter (PML) will use chaotically generated non-linear structures to provide a low insertion loss HPM/EMP limiter. During this effort, a "pseudo" metamaterial will be resear ...

    SBIR Phase I 2008 Missile Defense AgencyDepartment of Defense
  5. Compact High Power Microwave Payloads

    Amount: $99,998.00

    Fractal Meta Material (FMM) will be used to develop FEG working bodies based on the state-of-art ferroelectric material such as PZT 95/5 to experimentally establish their first order device characteri ...

    SBIR Phase I 2009 Missile Defense AgencyDepartment of Defense
  6. Innovative Hardware Technologies for Anti-Jam and Electromagnetic Attack Rejection in Ballistic Missile Defense System (BMDS) Radars

    Amount: $999,466.00

    The proposed research promises to replace current front-end limiter technologies, which do not provide the necessary growth potential for evolving threats, with a technology that does. This would enab ...

    SBIR Phase II 2009 Missile Defense AgencyDepartment of Defense
  7. Innovative Hardware Technologies for Anti-Jam and Electromagnetic Attack Rejection in Ballistic Missile Defense System (BMDS) Radars

    Amount: $99,999.00

    The proposed research will investigate the application of conductive high field emission microstructures encapsulated in a non-linear polymer binder material to develop a coatable, limiter technology ...

    SBIR Phase I 2009 Missile Defense AgencyDepartment of Defense
  8. Innovative Hardware Technologies for Anti-Jam and Electromagnetic Attack Rejection in Ballistic Missile Defense System (BMDS) Radars

    Amount: $1,499,937.00

    The proposed research promises to replace and/or complement current front end limiter technologies, which do not provide the necessary growth potential for evolving threats, with a technology that doe ...

    SBIR Phase II 2011 Department of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government