Tri-tech Inc

Basic Information

4514 Old Columbia Pike
Annandale, VA, 22003

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 4


  1. ELECTRONIC EQUIPMENT SHELTER MATERIAL AND STRUCTURAL ANALYSES

    Amount: $48,560.00

    THIS ANALYSIS WILL EVALUATE THREE KEY CRITERIA OF TACTICAL ELECTRONIC SHELTERS: MATERIAL, STRUCTURES AND FABRICATION TECHNIQUES. THE EVALUATION WILL BE MADE AGAINST AIR FORE SHELTER DESIGN CONSIDERATI ...

    SBIR Phase I 1987 Air ForceDepartment of DefenseDepartment of Defense
  2. THE STUDY DEFINES A FIVE YEAR DEVELOPMENT PLAN FOR S-BAND SOLID STATE RADAR TRANSMITTER MODULES.

    Amount: $42,040.00

    THE STUDY DEFINES A FIVE YEAR DEVELOPMENT PLAN FOR S-BAND SOLID STATE RADAR TRANSMITTER MODULES. COMPARISONS ARE MADE OF EXISTING AND PLANNED RADAR SETS IN ORDER TO DETERMINE REQUIRED CHARACTERISTICS ...

    SBIR Phase I 1986 NavyDepartment of DefenseDepartment of Defense
  3. THE EXCLUSIVE USE OF GROUND BASED RADAR FOR AIR SURVEIL LANCE IS RESTRICTIVE IN THAT LOW FLYING AIRCRAFT CANNOT BE DETECTED WHILE THEY ARE MASKED BY TERRAIN FEATURES, OR BELOWRADAR LINE-OF-SIGHT.

    Amount: $38,076.00

    THE EXCLUSIVE USE OF GROUND BASED RADAR FOR AIR SURVEIL LANCE IS RESTRICTIVE IN THAT LOW FLYING AIRCRAFT CANNOT BE DETECTED WHILE THEY ARE MASKED BY TERRAIN FEATURES, OR BELOWRADAR LINE-OF-SIGHT. A PO ...

    SBIR Phase I 1986 NavyDepartment of DefenseDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government