You are here

RAPID DEPLOYMENT OF ELECTRIC POWER CABLES - NOVEL CONCEPT

Award Information
Agency: Department of Defense
Branch: Army
Contract: N/A
Agency Tracking Number: 4551
Amount: $355,000.00
Phase: Phase II
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 1988
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
1554 Swallow Way
Hercules, CA 94547
United States
DUNS: N/A
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 Thomas F Callahan
 (617) 887-8911
Business Contact
Phone: () -
Research Institution
N/A
Abstract

MERADCOM IS REDUCING THE NUMBER OF GENERATORS IN THE FIELD; MANY MODERN WEAPONS DEPEND ON ELECTRICITY; THUS, A COMBAT MISSION'S SUCCESS MAY TURN ON THE ABILITY TO RAPIDLY DEPLOY ELECTRIC CABLES AND CONNECTORS. THE IMPORTANT DESCRIPTIVE CHARACTERISTICS OF THE CONCEPT ARE RAPID, MOBILE, RELIABLE & FLEXIBLE (RMRF). THE HALLMARK OF THE SYSTEM IS ITS FLEXIBILITY. THE CONCEPT WOULD EMPLOY A PRECOILED CABLE STORED IN A COLLAPSIBLE CONTAINER AND A LAUNCHING DEVICE TO PROPEL ONE END OF THE CABLE THROUGH THE AIR. THE CONCEPT ALSO RECOGNIZES THE NEED TO MINIMIZE THE VARIETY OF SPECIALIZED EQUIPMENT IN THE FIELD AND WILL UTILIZE EXISTING COMBAT HARDWARE TO LAUNCH THE CABLE/CONNECTOR TOWARD ITS OBJECTIVE. IF HOWEVER, IN THE TURMOIL OF COMBAT, THE PRIMARY SYSTEM IS UNAVAILABLE, THE FLEXIBLE SYSTEM IS DESIGNED TO PERMIT THE USE OF ANY ONE OF SEVERAL SECONDARY DEPLOYMENT OPTIONS. THE CRITICAL, PHASE I, TECHNICAL ISSUES ARE: (1) TO ELIMINATE THE CABLE'S TENDENCY TO KINK BY PROPER COILING OR DEPLOYMENT METHODS (EXTERIOR BALLISTICS); (2) TO ESTABLISH THE OPTIMUM LAUNCHING DEVICE AND ADAPTOR KIT; (3) TO CONFIGURE THE COLLAPSIBLE PACKAGE. THE PI HAS PARTICIPATED IN SEVERAL RAPID DEPLOYMENT PROGRAMS.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government