Variation Reduction Solutions Inc

Company Information

Company Name
Variation Reduction Solutions Inc
Address
14901 Galleon Court
Plymouth, MI, -
Phone
1 734-414-0035
URL
http://www.vrs-inc.com
DUNS
13476390
Number of Employees
29
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$699,929.00
6
SBIR Phase II
$12,497,730.00
3

Award List

  1. Aircraft Outer Mold Line (OML) Control

    Amount: $100,000.00

    The initial focus of this solicitation is for the establishment of an automated affordable, accurate dimensional control of aircraft OML structures for the military aircraft production line. The Air F ...

    SBIR Phase I 2010 Air ForceDepartment of Defense
  2. Affordable Accurate Robot Guidance (AARG)

    Amount: $4,800,000.00

    The authors establish a novel metrology system capable of determining the pose of a robotically-mounted End of Arm Tool (EOAT) in Six Degrees of Freedom (6-DOF) to a capability better than True Positi ...

    SBIR Phase II 2010 Department of Defense
  3. Terminally Guided Robots and Robotic Applications in Confined Spaces

    Amount: $99,929.00

    Variation Reduction Solutions, Inc. (VRSI) has created a partnership with Comau Pico to address the Air Force's stated desire to increase the use of robotics in aerospace manufacturing. Standard arti ...

    SBIR Phase I 2007 Air ForceDepartment of Defense
  4. Terminally Guided Robots and Robotic Applications in Confined Spaces

    Amount: $3,597,730.00

    Northrop Grumman Corporation (NGC) has a contract with Lockheed Martin to design, build, and produce the center fuselage section of the Joint Strike Fighter (JSF F-35). There are three ducts which ar ...

    SBIR Phase II 2007 Air ForceDepartment of Defense
  5. Affordable Accurate Robot Guidance (AARG)

    Amount: $100,000.00

    The field of high-precision manufacturing, especially in the aerospace industry, has traditionally required either manual processes or the use of monolithic Cartesian NC-type machines. There are many ...

    SBIR Phase I 2009 Air ForceDepartment of Defense
  6. Automated Fastener Installation System

    Amount: $100,000.00

    Saomething BENEFIT: Something

    SBIR Phase I 2011 Department of Defense
  7. Automated Liquid Shim Application

    Amount: $150,000.00

    ABSTRACT: Our team will develop a method for applying exact controlled amounts of highly viscous Liquid Shim material within established Production process specifications for aircraft structure throu ...

    SBIR Phase I 2011 Department of Defense
  8. Measurement of Hole Depth During Automated Drilling

    Amount: $150,000.00

    ABSTRACT: Objective: Develop a method for measuring the depth of holes drilled through stacks of material with minimal impact to the drilling process to replace manual grip measurements. Descriptio ...

    SBIR Phase I 2012 Department of Defense
  9. Automated Fastener Installation System

    Amount: $4,100,000.00

    ABSTRACT: Sorting, solvent-cleaning, promoting, delivering, sealing and installing 30,000 fasteners per day is a critical task required for full-rate production of the F-35 Lightning II. These 30, ...

    SBIR Phase II 2012 Department of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government