Vector Research Company, Inc.

Basic Information

2101 E. Jefferson Street
Suite 700
Rockville, MD, 20852

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 12


  1. The Design and Development of Shock Wave Attenuating Foam Materials

    Amount: $69,688.00

    The objective of the task is to develop materials, formulations, and processes that will withstand the effects of underwater explosions to help ensure the survivability of vulnerable, wet components a ...

    SBIR Phase I 1995 NavyDepartment of DefenseDepartment of Defense
  2. Campaign-Level Model for Assessing Theater Airlift Capability

    Amount: $61,093.00

    The objective of the research is to prepare an overall plan to develop, in an SBIR Phase II effort, a model or set of models which can be used to assess the impact of theater airlift on warfighting ef ...

    SBIR Phase I 1994 Air ForceDepartment of DefenseDepartment of Defense
  3. ANALYTIC METHODS FOR ELECTRONIC WARFARE VULNERABILITY ASSESSMENTS

    Amount: $375,817.00

    THE PROPOSED RESEARCH WILL DEVELOP AN ANALYTIC MODEL TO SUPPORT THE ASSESSMENT OF ELECTRONIC WARFARE VULNERABILITY OF AIR DEFENSE SYSTEMS AND TO EVALUATE APPROPRIATE ECCM SYSTEM CONCEPTS OR SYSTEMS. T ...

    SBIR Phase II 1992 ArmyDepartment of DefenseDepartment of Defense
  4. DECISION SUPPORT SYSTEM TO EVALUATE ALTERNATIVE ATT DESIGN CONCEPTS BASED ON CONTRIBUTION TO SUPPORT FORCE WARFIGHTING EFFECTIVENESS

    Amount: $499,267.00

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO DEVELOP A PRELIMINARY DESIGN FOR A DECISION SUPPORT SYSTEM WHICH CAN BE USED BY ASD IN CONNECTION WITH ADVANCED TRANSPORT TECHNOLOGY R&D PLANNING. THE SYST ...

    SBIR Phase II 1991 Air ForceDepartment of DefenseDepartment of Defense
  5. REQUIREMENTS FOR AN AUTOMATED HUMAN FACTORS, MANPOWER, PERSONNEL AND TRAINING (HMPT) PLANNING TOOL

    Amount: $48,973.00

    THE PHASE I RESEARCH WILL ESTABLISH THE FUNCTIONAL AND INFORMATION REQUIREMENTS FOR AN EFFECTIVE AUTOMATED DESIGN ANALYSIS AND CREW PERFORMANCE ASSESSMENT METHODOLOGY FOR USED IN PREMILESTONE I PLANNI ...

    SBIR Phase I 1991 Air ForceDepartment of DefenseDepartment of Defense
  6. DECISION SUPPORT SYSTEM TO EVALUATE ALTERNATIVE ATT DESIGN CONCEPTS BASED ON CONTRIBUTION TO SUPPORT FORCE WARFIGHTING EFFECTIVENESS

    Amount: $50,000.00

    N/A

    SBIR Phase I 1989 Air ForceDepartment of DefenseDepartment of Defense
  7. ANALYTIC METHODS FOR ELECTRONIC WARFARE VULNERABILITY ASSESSMENTS

    Amount: $50,000.00

    N/A

    SBIR Phase I 1989 ArmyDepartment of DefenseDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government