You are here

Vector Research Company, Inc.

Company Information
Address
2101 E. Jefferson Street Suite 700
Rockville, MD 20852
United States



Information

UEI: N/A

# of Employees: 12


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. The Design and Development of Shock Wave Attenuating Foam Materials

    Amount: $69,688.00

    The objective of the task is to develop materials, formulations, and processes that will withstand the effects of underwater explosions to help ensure the survivability of vulnerable, wet components a ...

    SBIRPhase I1995Department of Defense Navy
  2. Campaign-Level Model for Assessing Theater Airlift Capability

    Amount: $61,093.00

    The objective of the research is to prepare an overall plan to develop, in an SBIR Phase II effort, a model or set of models which can be used to assess the impact of theater airlift on warfighting ef ...

    SBIRPhase I1994Department of Defense Air Force
  3. ANALYTIC METHODS FOR ELECTRONIC WARFARE VULNERABILITY ASSESSMENTS

    Amount: $375,817.00

    THE PROPOSED RESEARCH WILL DEVELOP AN ANALYTIC MODEL TO SUPPORT THE ASSESSMENT OF ELECTRONIC WARFARE VULNERABILITY OF AIR DEFENSE SYSTEMS AND TO EVALUATE APPROPRIATE ECCM SYSTEM CONCEPTS OR SYSTEMS. T ...

    SBIRPhase II1992Department of Defense Army
  4. DECISION SUPPORT SYSTEM TO EVALUATE ALTERNATIVE ATT DESIGN CONCEPTS BASED ON CONTRIBUTION TO SUPPORT FORCE WARFIGHTING EFFECTIVENESS

    Amount: $499,267.00

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO DEVELOP A PRELIMINARY DESIGN FOR A DECISION SUPPORT SYSTEM WHICH CAN BE USED BY ASD IN CONNECTION WITH ADVANCED TRANSPORT TECHNOLOGY R&D PLANNING. THE SYST ...

    SBIRPhase II1991Department of Defense Air Force
  5. REQUIREMENTS FOR AN AUTOMATED HUMAN FACTORS, MANPOWER, PERSONNEL AND TRAINING (HMPT) PLANNING TOOL

    Amount: $48,973.00

    THE PHASE I RESEARCH WILL ESTABLISH THE FUNCTIONAL AND INFORMATION REQUIREMENTS FOR AN EFFECTIVE AUTOMATED DESIGN ANALYSIS AND CREW PERFORMANCE ASSESSMENT METHODOLOGY FOR USED IN PREMILESTONE I PLANNI ...

    SBIRPhase I1991Department of Defense Air Force
  6. DECISION SUPPORT SYSTEM TO EVALUATE ALTERNATIVE ATT DESIGN CONCEPTS BASED ON CONTRIBUTION TO SUPPORT FORCE WARFIGHTING EFFECTIVENESS

    Amount: $50,000.00

    N/A

    SBIRPhase I1989Department of Defense Air Force
  7. ANALYTIC METHODS FOR ELECTRONIC WARFARE VULNERABILITY ASSESSMENTS

    Amount: $50,000.00

    N/A

    SBIRPhase I1989Department of Defense Army
US Flag An Official Website of the United States Government