You are here
Vector Research Company, Inc.
UEI: N/A
# of Employees: 12
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
The Design and Development of Shock Wave Attenuating Foam Materials
Amount: $69,688.00The objective of the task is to develop materials, formulations, and processes that will withstand the effects of underwater explosions to help ensure the survivability of vulnerable, wet components a ...
SBIRPhase I1995Department of Defense Navy -
Campaign-Level Model for Assessing Theater Airlift Capability
Amount: $61,093.00The objective of the research is to prepare an overall plan to develop, in an SBIR Phase II effort, a model or set of models which can be used to assess the impact of theater airlift on warfighting ef ...
SBIRPhase I1994Department of Defense Air Force -
ANALYTIC METHODS FOR ELECTRONIC WARFARE VULNERABILITY ASSESSMENTS
Amount: $375,817.00THE PROPOSED RESEARCH WILL DEVELOP AN ANALYTIC MODEL TO SUPPORT THE ASSESSMENT OF ELECTRONIC WARFARE VULNERABILITY OF AIR DEFENSE SYSTEMS AND TO EVALUATE APPROPRIATE ECCM SYSTEM CONCEPTS OR SYSTEMS. T ...
SBIRPhase II1992Department of Defense Army -
DECISION SUPPORT SYSTEM TO EVALUATE ALTERNATIVE ATT DESIGN CONCEPTS BASED ON CONTRIBUTION TO SUPPORT FORCE WARFIGHTING EFFECTIVENESS
Amount: $499,267.00THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO DEVELOP A PRELIMINARY DESIGN FOR A DECISION SUPPORT SYSTEM WHICH CAN BE USED BY ASD IN CONNECTION WITH ADVANCED TRANSPORT TECHNOLOGY R&D PLANNING. THE SYST ...
SBIRPhase II1991Department of Defense Air Force -
REQUIREMENTS FOR AN AUTOMATED HUMAN FACTORS, MANPOWER, PERSONNEL AND TRAINING (HMPT) PLANNING TOOL
Amount: $48,973.00THE PHASE I RESEARCH WILL ESTABLISH THE FUNCTIONAL AND INFORMATION REQUIREMENTS FOR AN EFFECTIVE AUTOMATED DESIGN ANALYSIS AND CREW PERFORMANCE ASSESSMENT METHODOLOGY FOR USED IN PREMILESTONE I PLANNI ...
SBIRPhase I1991Department of Defense Air Force -
DECISION SUPPORT SYSTEM TO EVALUATE ALTERNATIVE ATT DESIGN CONCEPTS BASED ON CONTRIBUTION TO SUPPORT FORCE WARFIGHTING EFFECTIVENESS
Amount: $50,000.00N/A
SBIRPhase I1989Department of Defense Air Force -
ANALYTIC METHODS FOR ELECTRONIC WARFARE VULNERABILITY ASSESSMENTS
Amount: $50,000.00N/A
SBIRPhase I1989Department of Defense Army