Williamson & Assoc Inc.

Company Information
Address 731 N Northlake Way Ste 104
Seattle, WA, 98103


Information

DUNS:

# of Employees: N/A


Ownership Information

Hubzone Owned: N

Socially and Economically Disadvantaged: N

Woman Owned: N



Award Charts




Award Listing

  1. REMOTELY OPERATED SEAFLOOR ROCK DRILL WITH EXTENDED CORING CAPABILITY

    Amount: $299,747.00

    RESEARCHERS ARE INVESTIGATING THE FEASIBILITY OF A REMOTELY OPERATED ROCK DRILL WITH EXTENDED CORING CAPABILITY. A RELIABLE MEANS OF RECOVERING CORE SAMPLES FROM 10 TO 50 METERS DEEP, IN BOTH CONSOLID ...

    SBIRPhase II1995National Science Foundation
  2. REMOTELY OPERATED SEAFLOOR ROCK DRILL WITH EXTENDED CORING CAPABILITY

    Amount: $50,000.00

    N/A

    SBIRPhase I1993National Science Foundation
  3. VICE

    Amount: $28,960.00

    THIS PROPOSAL PRESENTS A PROGRAM TO RESEARCH THE TECHNICAL AND ECONOMIC FEASIBILITY OF AN OCEANOGRAPHIC INSTRUMENT CAPABLE OF RETRIEVING SAMPLES FROM THE UPPER 0.2 TO 1.0 METERS OF EXPOSED ROCK, OXIDE ...

    SBIRPhase I1986Department of Commerce
  4. THIS PROPOSAL PRESENTS A PROGRAM TO RESEARCH THE TECHNICAL FEASIBILITY OF AN OCEANOGRAPHIC INSTRUMENT CAPABLE OF DRILLING AND RETRIEVING 40 METER CORE SAMPLES FROM SELECTED BARE ROCK SITES ON THE DEEP OCEAN SEAFLOOR.

    Amount: $35,000.00

    THIS PROPOSAL PRESENTS A PROGRAM TO RESEARCH THE TECHNICAL FEASIBILITY OF AN OCEANOGRAPHIC INSTRUMENT CAPABLE OF DRILLING AND RETRIEVING 40 METER CORE SAMPLES FROM SELECTED BARE ROCK SITES ON THE DEEP ...

    SBIRPhase I1983National Science Foundation

Agency Micro-sites

US Flag An Official Website of the United States Government