Winzen Engineering, Inc.

Basic Information

23350 Southfork
San Antonio, TX, 78255-2108

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 1


  1. Titan Balloon Convection Model

    Amount: $100,000.00

    This innovative research effort is directed at determining, quantitatively, the convective heat transfer coefficients applicable to a Montgolfiere balloon operating in an atmosphere simulating that of ...

    SBIR Phase I 2007 National Aeronautics and Space Administration
  2. N/A

    Amount: $70,000.00

    N/A

    SBIR Phase I 2000 National Aeronautics and Space Administration
  3. N/A

    Amount: $600,000.00

    N/A

    SBIR Phase II 1999 National Aeronautics and Space Administration
  4. New Balloon Envelope Material Specification

    Amount: $70,000.00

    N/A

    SBIR Phase I 1998 National Aeronautics and Space Administration
  5. A Balloon Assisted Launch System

    Amount: $549,974.00

    This innovation proposes the use of a thin film stratospheric balloon to lift a launch vehicle with a payload to an altitude above most of the Earth's atmosphere, then ignite the launch vehicle rocket ...

    SBIR Phase II 1996 Air Force Department of Defense
  6. A Balloon Assisted Launch System

    Amount: $79,979.00

    N/A

    SBIR Phase I 1995 Air Force Department of Defense
  7. Balloon Lifting-Gas Temperature Control System

    Amount: $49,891.00

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  8. AUTOMATED SEAL FLAW DETECTION

    Amount: $494,951.00

    THIS PROPOSAL ADDRESSES THE DEVELOPMENT OF AN AUTOMATED REAL-TIME FLAW DETECTION SYSTEM FOR EVALUATING HEAT SEALS OF SCIENTIFIC BALLOONS. SEVERAL MEASUREMENT DEVICES WILL BE LABORATORY TESTED FOR THEI ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  9. AUTOMATED SEAL FLAW DETECTION

    Amount: $49,987.00

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  10. LONG DURATIONN BALLOON TECHNOLOGY

    Amount: $246,851.00

    THIS PROPOSAL ADDRESSES THE DESIGN AND FABRICATION OF A LONG ENDURANCE BALLOON VEHICLE HAVING A ONE-YEAR LIFE AT 120,000 FEET. THE CONCEPT MAKES USE OF THE EXPERIENCE GAINED BY THE SCIENTIFIC COMMUNIT ...

    SBIR Phase II 1989 Defense Advanced Research Projects Agency Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government