X-L SYNERGY, LLC

Basic Information

2000 Wyoming Ave.
El Paso, TX, 79903

Company Profile

n/a

Additional Details

Field Value
DUNS: 40571338
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 3


  1. Arc Fault Quenching for Mission Critical Systems

    Amount: $746,198.00

    Phase 1 research demonstrated the feasibility of using solid state electronics to manage an arc fault situation. In particular, by implementing brief interruptions of power to a conductor that is su ...

    SBIR Phase II 2004 Air Force Department of Defense
  2. Arc Fault Quenching for Mission Critical Systems

    Amount: $100,000.00

    Solid state circuit breaker technology can enhance existing arc fault detection technology by providing a higher tolerance to nuisance tripping and by providing an opportunity to maintain some reduced ...

    SBIR Phase I 2003 Air Force Department of Defense
  3. BIOFEEDBACK APPARATUS FOR HOME TREATMENT OF BRUXISM

    Amount: $50,000.00

    THE PHASE I OBJECTIVE IS TO DESIGN A BIOFEEDBACK APPARATUS FOR THE HOME TREATMENT OF NOCTURNAL BRUXISM AND TO CONDUCT A PILOT STUDY ON ITS EFFECTIVENESS. THIS APPARATUS WILL CONSIST OF A BRUXISM SENSO ...

    SBIR Phase I 1991 Department of Health and Human Services

Agency Micro-sites

US Flag An Official Website of the United States Government