Foster-miller/ciccone V J

Basic Information

14045 Jefferson Davis Hwy
Woodbridge, VA, 22191

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 18


  1. MULTISTORY BUILDINGS PRESENT A DUAL CHALLENGE TO THE USE OF NATURAL LIGHT: (1) THE AMOUNT OF SURFACE AREA AVAILABLE FOR COLLECTING DAYLIGHT IS NORMALLY SMALL AND (2) MANY PARTS OF THE BUILDING ARE REMOTE FROM THE COLLECTION APERTURES. HOWEVER, THE DIRECT

    Amount: $518,000.00

    N/A

    SBIR Phase II 1988 ArmyDepartment of DefenseDepartment of Defense
  2. UNIVERSAL CLEANING OF REVERSE OSMOSIS MEMBRANES THROUGH INNOVATIVE DESIGNS IN MEMBRANES SPACERS SUPPLEMENTED BY ULTRASONIC VIBRATIONS

    Amount: $50,079.00

    THIS TECHNICAL PROPOSAL PRESENTS NEW CONCEPTS IN DESIGN AND OPERATIONS WHICH MAY BE APPLIED TO THE RESTORATION OF REVERSE OSMOSIS (RO) MEMBRANES AFTER USE. THE PROPOSED SBIR PHASE I RESEARCH WILL BE C ...

    SBIR Phase I 1987 ArmyDepartment of DefenseDepartment of Defense
  3. THIS TECHNICAL PROPOSAL PRESENTS A LIGHT-WEIGHT MANUALLY INSTALLED RAW WATER INTAKE TO BE USED IN OPERATION WITH TRANSPORTABLE MILITARY WATER PURIFICTION UNITS WHEN SOURCE WATER IS OBTAINED FROM OCEAN SURFSIDE LOCATIONS.

    Amount: $49,818.00

    THIS TECHNICAL PROPOSAL PRESENTS A LIGHT-WEIGHT MANUALLY INSTALLED RAW WATER INTAKE TO BE USED IN OPERATION WITH TRANSPORTABLE MILITARY WATER PURIFICTION UNITS WHEN SOURCE WATER IS OBTAINED FROM OCEAN ...

    SBIR Phase I 1986 ArmyDepartment of DefenseDepartment of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government