You are here

DEPRESSED COLLECTORS FOR MEGAWATT GYROTRONS

Award Information
Agency: Department of Energy
Branch: N/A
Contract: N/A
Agency Tracking Number: 11626
Amount: $50,000.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 1990
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
635 Slaters Lane #g101
Alexandria, VA 22314
United States
DUNS: N/A
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 () -
Business Contact
 J.T. SCHRIEMPF
Title: VICE PRESIDENT
Phone: (703) 548-6410
Research Institution
N/A
Abstract

A PROGRAM IS PROPOSED TO SHOW THE FEASIBILITY OF DEPRESSED COLLECTORS FOR VERY HIGH AVERAGE POWER (APPROX. 1MW) GYROTRON OSCILLATORS FOR FUSION APPLICATIONS. INITIAL CALCULATIONS INDICATE THAT COLLECTION EFFICIENCIES EXCEEDING 75% CAN BE REALIZED. USE OF SUCH A COLECTOR ON A GYROTRON WITH A BASE EFFICIENCY OF 30% WOULD INCREASE THE EFFICIENCY TO OVER 60%. SUCH A DRAMATIC INCREASE IN EFFICIENCY WOULD RESULT IN SUBSTANTIAL SAVINGS IN THE REALIZATION AND OPERATION OF HIGH POWER ELECTRON CYCLOTRON HEATING SYSTEMS IN FUSION DEVICES SUCH AS CIT, ITER, AND OTHERS. IN PHASE I, A STUDY OF THE FEASIBILITY OF THE USE OF COLLECTORS ON MEGAWATT GYROTRONS WITH FREQUENCIES FROM 100 GHZ TO 280 GHZ WOULD BE MADE, AND A DETAILED DESIGN REALIZED FOR A MULTI-STAGE DEPRESSED COLLECTOR FOR A 1 MW, 110 GHZ GYROTRON CURRENTLY BEING DEVELOPED BY DOE. IN PHASE II, THE COLLECTOR WOULD BE FABRICATED AND TESTED.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government