Modular, Rapid, Common Hardware-in-the-loop Framework Development

Award Information
Agency:
Department of Defense
Branch
Army
Amount:
$728,950.00
Award Year:
2012
Program:
SBIR
Phase:
Phase II
Contract:
W31P4Q-12-C-0118
Agency Tracking Number:
A2-4840
Solicitation Year:
2010
Solicitation Topic Code:
A10-004
Solicitation Number:
2010.1
Small Business Information
WideBand Corporation
401 W. Grand, Gallatin, MO, -
Hubzone Owned:
N
Socially and Economically Disadvantaged:
N
Woman Owned:
N
Duns:
838700573
Principal Investigator:
Roger Billings
Chairman
(660) 663-3000
billings@wband.com
Business Contact:
Joseph Billings
President
(660) 663-3000
billingsj@wband.com
Research Institution:
Stub




Abstract
The Phase II technical objective of this project is to implement the technology conceived in Phase I into hardware prototypes that can be tested in an actual HWIL test lab environment. The developments and experience acquired in Phase I will be used to design and assemble a fully functional central switching unit, which in a WideBand Network is referred to as a network Concentrator. The goal of the Concentrator is to provide minimal latency, low jitter, and high bandwidth in a multi-node communication environment. Based on the research completed in Phase I, it is expected that a port-to-port latency of 20ns can be achieved. This delay would be roughly equivalent to the latency added by a four meter cable.

* information listed above is at the time of submission.

Agency Micro-sites

US Flag An Official Website of the United States Government