Vista Clara Inc.

Basic Information

12201 Cyrus Way
Suite 104
Mukilteo, WA, 98275-5735

http://www.vista-clara.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 43232482
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 14


  1. Rapid Scanning Surface NMR for Efficient Land and Airborne Hydrogeologic Mapping

    Amount: $225,000.00

    Statement of the problem that is being addressed: This proposal addresses the challenge of non-invasively measuring subsurface hydrogeologic properties that control the transport of contaminants and a ...

    SBIR Phase I 2015 Department of Energy
  2. Low cost, Autonomous NMR and Multi-sensor Soil Monitoring Instrument

    Amount: $1,499,997.60

    This proposal addresses the need for low-cost sensors to provide accurate, long-term in-situ monitoring of soil moisture content, and other physical and chemical soil properties of relevance to carbon ...

    SBIR Phase II 2015 Department of Energy
  3. Low Cost In-Situ NMR Technologies for Monitoring Biological and Geochemical Processes in the Subsurface

    Amount: $375,000.00

    This proposal addresses the need to monitor and characterize subsurface biogeochemical and hydrogeologic properties in-situ. Specifically this sequential Phase IIB effort addresses the commercial need ...

    SBIR Phase II 2015 Department of Energy
  4. Low cost, AutoNomous NMR and Multi-sensor Soil Monitoring Instrument

    Amount: $225,000.00

    This proposal addresses the need for low-cost sensors to provide accurate, long-term in-situ monitoring of soil moisture content, and other physical and chemical soil properties of relevance to carbon ...

    SBIR Phase I 2014 Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government