ACTA, INC.

Basic Information

2790 SKYPARK DR STE 310
TORRANCE, CA, 90505-5345

http://www.actainc.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 131277725
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 30


  1. Weapons Effects FRMs for Contact or Embedded Detonations in Fixed Targets

    Amount: $149,917.00

    ABSTRACT: This is a nine-month SBIR Phase I project titled"Weapons Effects FRMs for Contact or Embedded detonations in Fixed Targets."The stated objective of this solicitation topic is to d ...

    SBIR Phase I 2014 Air Force Department of Defense
  2. Multiphysics-based Sensor Fusion

    Amount: $149,990.00

    ABSTRACT: ACTA and Sandia National Laboratories will develop and demonstrate advanced concepts for processing large and disparate data streams from multiple classes of sensors using multi-physics bas ...

    STTR Phase I 2014 Air Force Department of Defense
  3. Weapon Burial Secondary Debris (WBSD)

    Amount: $746,428.00

    ABSTRACT: Most of the air delivered air force weapons are designed to detonate inside structures. However, due to targeting inaccuracies and other reasons they may land outside a structure and could ...

    SBIR Phase II 2013 Air Force Department of Defense
  4. Weapon Burial Secondary Debris (WBSD)

    Amount: $149,995.00

    ABSTRACT: Most of the air delivered air force weapons are designed to detonate inside structures. However, due to targeting inaccuracies and other reasons they may land outside a structure and could ...

    SBIR Phase I 2012 Department of Defense Air Force
  5. Munitions Effects on Building Infrastructure Components

    Amount: $749,872.00

    ABSTRACT: Functional Kill of buildings and below-ground structures is becoming an increasing area of concern for war fighters. Functional Kill refers to defeating a building by rendering it or its c ...

    SBIR Phase II 2012 Department of Defense Air Force
  6. QMU in Integrated Spacecraft System Models

    Amount: $599,978.00

    ACTA and Sandia National Laboratories propose to quantify and propagate substructure modeling uncertainty for reduced-order substructure models to higher levels of system assembly, thereby enabling pr ...

    STTR Phase II 2011 National Aeronautics and Space Administration
  7. Predicting Structural Debris and Secondary Air-Blast

    Amount: $99,951.00

    The secondary debris generated during the breakup of walls and slabs interacts with the high pressure gases passing through cracks in the separated material. This interaction causes a reduction of bla ...

    SBIR Phase I 2011 Department of Defense Air Force
  8. Munitions Effects on Building Infrastructure Components

    Amount: $99,968.00

    Functional Kill of buildings and below-ground structures is becoming an increasing area of concern for war fighters. Functional Kill refers to defeating a building by rendering it or its contents (in ...

    SBIR Phase I 2011 Department of Defense Air Force
  9. QMU in Integrated Spacecraft System Models

    Amount: $99,991.00

    ACTA and Sandia National Laboratories propose to quantify and propagate substructure modeling uncertainty for reduced-order substructure models to higher levels of system assembly, thereby enabling pr ...

    STTR Phase I 2010 National Aeronautics and Space Administration
  10. Weapons Effects FRMs for Small Munitions on Urban Reinforced Concrete Walls/Slabs

    Amount: $738,784.00

    A 24-month SBIR Phase II Project titled"Weapons Effects FRMs for Small Munitions on Urban Reinforced Concrete Walls/Slabs."The stated objective of this solicitation topic is to develop High- ...

    SBIR Phase II 2010 Department of Defense Air Force

Agency Micro-sites

US Flag An Official Website of the United States Government