Mobile Factory Design for On-Site Wind Turbine Tower Production

Award Information
Agency: Department of Agriculture
Branch: N/A
Contract: 2014-00085
Agency Tracking Number: 2014-00085
Amount: $99,998.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: 8.6
Solicitation Number: N/A
Timeline
Solicitation Year: 2014
Award Year: 2014
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
28 DANE ST, Somerville, MA, 02143-0000
DUNS: 829983266
HUBZone Owned: N
Woman Owned: N
Socially and Economically Disadvantaged: N
Principal Investigator
 Eric Smith
 CEO
 (857) 225-0552
 eric@keystonetowersystems.com
Business Contact
 Rosalind Takata
Title: COO
Phone: (857) 225-0326
Email: roz@keystonetowersystems.com
Research Institution
 Stub
Abstract
Larger, taller wind turbines could significantly reduce the cost of wind energy and enable much broader deployment. For example, a recent study from the National Renewable Energy Lab [NREL/TP-5000-61063] showed that increasing tower heights from 96m to 140m would nearly double the available wind resource in the US (adding 1,800 GW) and bring wind development to many areas where it is not currently feasible. However, traditional tower designs cannot cost-effectively scale up due to the size constraints associated with road and rail transportation. Even today towers are on the edge of what can be transported, even with specialty trucks, expensive escorts and significant structural sub-optimization. Keystone Tower Systems has developed an advanced manufacturing process that solves this problem by enabling on-site tower production. With Keystone & #39;s system, which adapts the well-understood process of spiral welding to tower construction, transport limits are eliminated and tall, low-cost towers are made possible.Keystone has proven the economics of the tower-spiral-welding system, and has built a scale prototype to demonstrate the fundamental spiral welding technology. However, fully understanding and optimizing the on-site manufacturing process is also necessary to ensure that the system fills the needs of cost-effective wind energy production. In this project, Keystone will work closely with wind industry logistics experts and wind developers on a mobile fabrication facility that can be deployed at the wind farm. The project focuses on key aspects of on-site operation, such as tower coating selection and deployment logistics. Once completed, the results will be used as a basis for a full on-site facility design. With on-site tower production, turbines will be able to reach the strong winds at high hub-heights, reducing the cost of energy and increasing the area available for economic wind deployment. In addition, on-site production is inherently local, bringing jobs to the communities where the wind farm is installed.

* Information listed above is at the time of submission. *

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government