ADAM INSTRUMENT CO., INC.

Basic Information

5342 Hickory Trail Lane
Blue Ash, OH, 45242

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 3


  1. Non-Destructive Real-Time In-Situ Analysis of Vacuum Grown and Processed Infrared Material and Senso

    Amount: $750,000.00

    The objective of the proposed project is to develop innovative new analytical instrumentation and methodology capable of performing fully automated, non-destructive analysis of semiconductor sensor el ...

    SBIR Phase II 1998 Army Department of Defense
  2. Non-Destructive Real-Time In-Situ Analysis of Vacuum Grown and Processed Infrared Material and Sensor Arrays

    Amount: $100,000.00

    The objective of the proposed project is to develop innovative new analytical instrumentation and methodology capable of performing fully automated, non-destructive analysis of semiconductor sensor el ...

    SBIR Phase I 1997 Army Department of Defense
  3. Advanced Analytical Techniques for Determining Metal Speciation in Contaminated Soils

    Amount: $600,000.00

    The primary objective of the proposed project is to develop innovative new analytical instrumentation and methodology capable of non destructive detection and identification of trace amounts of metals ...

    SBIR Phase II 1996 Army Department of Defense
  4. Advanced Analytical Techniques for Determining Metal Speciation in Contaminated Soils

    Amount: $70,000.00

    N/A

    SBIR Phase I 1995 Army Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government