AEB ENGINEERING LLC

Basic Information

1610 NE EASTGATE BLVD
Pullman, WA, 99163 5625

Company Profile

Research and Development

Additional Details

Field Value
DUNS: 613016190
Hubzone Owned: N
Socially and Economically Disadvantaged: Y
Woman Owned: N
Number of Employees: 1


  1. Ammonia Removal and Recovery System Integrated with Anaerobic Digestion for Mitigating Air and Water Quality Impacts of Animal Operations

    Amount: $80,000.00

    Concentrated animal feeding operations (CAFOs) continue to experience every increasing pressure regarding nutrient overloads and air and water environmental concerns on their farms. Additionally the p ...

    SBIR Phase I 2009 Department of Agriculture
  2. Moving baffle for improving solids transport and reducing labor costs and phosphorous discharge in aquaculture raceways

    Amount: $80,000.00

    Flow-through raceways have velocities below that needed to remove solids from rearing areas and thus require intermittent, manual sweeping to remove the solids producing long solid residence times and ...

    SBIR Phase I 2007 Department of Agriculture
  3. SBIR Phase I: Development of a Two-Stage Culture Process for Production of Omega 3 Rich Algae from Biodiesel Waste Glycerol for Use as an Aquaculture Fish Feed Supplement

    Amount: $80,000.00

    This Small Business Innovation Research (SBIR) Phase I project develops a two-stage culture process of heterotrophic microalgae with a high cell density of more than 100 g/L to produce omega-3 fatty a ...

    SBIR Phase I 2007 National Science Foundation

Agency Micro-sites

US Flag An Official Website of the United States Government