AEROVIRONMENT, INC.

Company Information

Company Name
AEROVIRONMENT, INC.
Address
181 W. Huntington Drive, Suite 202
Monrovia, CA, 91016
Phone
1 626-357-9983
URL
n/a
DUNS
58024456
Number of Employees
400
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$2,498,715.00
31
SBIR Phase II
$12,794,646.00
13
STTR Phase I
$98,938.00
1

Award List

  1. OPERATIONAL MODEL FOR THE DESIGN OF OPTIMUM WIND BREAKS TO REDUCE WIND-CAUSED EROSION OF SOIL

    Amount: $49,128.00

    THE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP AN OPERATIONAL MODEL FOR THE DESIGN AND PLACEMENT OF WIND BREAKS TO CONTROLSOIL EROSION. OPTIMUM PROTECTION IS RELATED TO PHYSICAL PARAMETERS (HEIGHT, WIDT ...

    SBIR Phase I 1991 Department of Agriculture
  2. PASSIVE PROPELLER CONTROL

    Amount: $48,538.00

    VERY-HIGH-ALTITUDE, LONG-ENDURANCE (VHALE) TYPE AIRCRAFT OPERATE OVER A WIDE POWER RANGE DUE TO ALTITUDE AND FUEL LOAD CHANGES. MATCHING THE PROPELLER TO THE ENGINE OVER THIS RANGE IS DIFFICULT WITHOU ...

    SBIR Phase I 1991 National Aeronautics and Space Administration
  3. A LOOK-AHEAD ADAPTIVE CONTROL SYSTEM FOR WIND TURBINE GENERATORS

    Amount: $750,000.00

    EXISTING CONTROL SYSTEMS FOR PITCH-CONTROLLED WIND TURBINES STABILIZE ROTOR POWER BY ADJUSTING BLADE PITCH IN RESPONSE TO OVER-OR-UNDER POWER CONDITIONS IN A FEEDBACK LOOP. THE PITCH CONTROL MECHANIS ...

    SBIR Phase II 1995 Department of Energy
  4. Micro Unmanned Aerial Vehicle (UAV) System Design and Operation

    Amount: $98,152.00

    Aerovironmet Inc. proposes to undertake Phase I of DDARPA SBIR 962-080 to develop and assess operational utility of micro air vehicles (micro AV) for unique military applications. We will downselect ...

    SBIR Phase I 1996 Defense Advanced Research Projects AgencyDepartment of Defense
  5. Development of a Fixed-Wing Squad-Level Reconnaissance Micro Air Vehicle (MAV)

    Amount: $384,912.00

    Aerovironmet Inc. proposes to undertake Phase I of DDARPA SBIR 962-080 to develop and assess operational utility of micro air vehicles (micro AV) for unique military applications. We will downselect ...

    SBIR Phase II 1998 Defense Advanced Research Projects AgencyDepartment of Defense
  6. Hybrid Electric Power System for Aircraft Loaders

    Amount: $97,432.00

    N/A

    SBIR Phase I 1999 Air ForceDepartment of Defense
  7. Hybrid Electric Power System for Aircraft Loaders

    Amount: $738,716.00

    N/A

    SBIR Phase II 2000 Air ForceDepartment of Defense
  8. Active Load Reduction for High Altitude Long Endurance Remotely Piloted Aircraft

    Amount: $97,067.00

    N/A

    SBIR Phase I 1999 Defense Advanced Research Projects AgencyDepartment of Defense
  9. Development of a Woven Grid Quasi-Bipolar Battery

    Amount: $62,844.00

    A new high-power, high voltage sealed, quasi-bipolar lead acid battery design is proposed for development which can operate under the broad range of conditions important to the Air Force. Key features ...

    SBIR Phase I 1997 Missile Defense AgencyDepartment of Defense
  10. Skytote: An Innovative Aircraft with Unique Performance Capabilities

    Amount: $99,991.00

    The Skytote concept has emerged from a system analysis seeking a remotely/ autonomously controlled air vehicle for transporting materials -- a vehicle system that emphasizes simplicity, economy, and v ...

    SBIR Phase I 1998 Air ForceDepartment of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government