Agbabian Assocs

Basic Information

250 N Nash St
El Segundo, CA, 90245

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: 35


  1. HARDENED, RELIABLE, QUICK OPENING/CLOSING CLOSURES FOR THE TUNNELS IN A DEEP BASE ARE ESSENTIAL TO THE SURVIVAL AND OPERATION OF THE DEEP BASE.

    Amount: $45,060.00

    HARDENED, RELIABLE, QUICK OPENING/CLOSING CLOSURES FOR THE TUNNELS IN A DEEP BASE ARE ESSENTIAL TO THE SURVIVAL AND OPERATION OF THE DEEP BASE. IT IS PROPOSED TO (1) GENERATE A NUMBER OF CONCEPTS FOR ...

    SBIR Phase I 1985 Air Force Department of Defense
  2. A DEEP BASED SYSTEM WOULD PROBABLY BE LOCATED BELOW THE WATER TABLE.

    Amount: $40,291.00

    A DEEP BASED SYSTEM WOULD PROBABLY BE LOCATED BELOW THE WATER TABLE. IT WOULD THEREFORE BE SUBJECT TO SOME WATER INFLOW IN ALL PHASES OF CONSTRUCTION AND OPERATION, ALTHOUGH THE RATE OF INFLOW WOULD B ...

    SBIR Phase I 1985 Air Force Department of Defense
  3. INSTABILITY PHENOMENON

    Amount: $70,434.00

    UNDERGROUND EXCAVATIONS IN HARD ROCK SUBJECT TO DYNAMIC LOADING CAUSED BY NUCLEAR DETONATION MAY EXPERIENCE VIOLENT COLLAPSE (ROCKBURSTING) SIMILAR TO WHAT IS OBSERVED IN DEEP MINING OPERATIONS. THIS ...

    SBIR Phase I 1985 Defense Threat Reduction Agency Department of Defense
  4. METHODS

    Amount: $35,000.00

    NO METHODS EXIST WORLDWIDE TO TEST MAJOR BUILDINGS, IN-PLACEAND AS CONSTRUCTED, TO EARTHQUAKE MOTION-TIME HISTORIES UP TO AND INCLUDING DAMAGE AND COLLAPSE LEVELS. TESTING COMPLETE CIVIL STRUCTURES AT ...

    SBIR Phase I 1983 National Science Foundation

Agency Micro-sites

US Flag An Official Website of the United States Government