Air-Lock, Inc.

Company Information

Company Name
Air-Lock, Inc.
Address
CT
Milford, CT, 06460-4861
Phone
1 203-878-4691
URL
http://www.airlockinc.com
DUNS
1178680
Number of Employees
19

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$535,961.00
6
SBIR Phase II
$590,987.00
1
Chart code to be here

Award List

  1. Next Generation MK III Lightweight HUT/Hatch Assembly

    Amount: $64,231.00

    The Next Generation MK III Lightweight HUT/Hatch Assembly will maximize the Hard Upper Torso - Hatch assembly weight reduction through the combination of innovative material selection and cross sectio ...

    SBIR Phase I 2004 National Aeronautics and Space Administration
  2. Next Generation MK III Lightweight HUT/Hatch Assembly

    Amount: $590,987.00

    A prototype Next Generation MK III Lightweight HUT/Hatch Assembly will be fabricated and delivered during Phase II. Maximum weight reduction for the Hard Upper Torso - Hatch assembly will be acheived ...

    SBIR Phase II 2005 National Aeronautics and Space Administration
  3. Lower Profile, Lighter Weight Space Suit Bearings

    Amount: $64,800.00

    Air-Lock will deliver a final report based on the follwoing:1. Historical summary of bearing design evolution throughout the life of the EMU Program2. Material research to identify lightweight materia ...

    SBIR Phase I 2005 National Aeronautics and Space Administration
  4. Hard Upper Torso Shoulder Joint Design for Crew Member Sizing Adjustment and Enhanced Mobility

    Amount: $93,703.00

    Air-Lock, Incorporated proposes to design an Enhanced Shoulder Mobility Joint Assembly (ESMJA) that increases dynamic mobility and static sizing capabilities for spacesuited crewmembers (CM) employing ...

    SBIR Phase I 2008 National Aeronautics and Space Administration
  5. Interchangeable Bearings for Profile and Weight Trade Studies

    Amount: $97,782.00

    Air-Lock, Incorporated is proposing to design fully sealed shoulder and arm bearings with interchangeable bearing housings. The interchangeable housings shall be utilized in trade studies to determin ...

    SBIR Phase I 2009 National Aeronautics and Space Administration
  6. Design of a Self Don/Doffing Rear Entry Planetary Suit to Interface with a Suit Port/Lock

    Amount: $97,636.00

    Under Phase 1 of subject SBIR, Air-Lock, Incorporated will design a self donning and doffing Rear Entry Hard Upper Torso (REHUT) that interfaces with a suit port. This design will allow suited, pressu ...

    SBIR Phase I 2011 National Aeronautics and Space Administration
  7. Advanced Extravehicular Helmet Assembly

    Amount: $117,809.00

    The current NASA spacesuit community is focusing on utilizing a 13" hemispherical helmet for the next generation of extravehicular activity spacesuits. This helmet architecture presents the end u ...

    SBIR Phase I 2013 National Aeronautics and Space Administration

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government