Amac International, Inc.

Company Information

Company Name
Amac International, Inc.
Address
12050 Jefferson Avenue Suite 328
Newport News, VA, 23606
Phone
1 757-249-3594
URL
n/a
DUNS
166694831
Number of Employees
11
Hubzone Owned:
N
Minority Owned:
N
Woman Owned:
N

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$867,961.00
10
SBIR Phase II
$2,724,995.00
4
STTR Phase I
$99,900.00
1
STTR Phase II
$500,000.00
1

Award List

  1. N/A

    Amount: $99,900.00

    N/A

    STTR Phase I 2000 Department of Energy
  2. Novel, Reliable, and Cost-Effective Input Coupler for High RF Power Applications

    Amount: $500,000.00

    Input couplers capable of carrying high RF power to superconducting accelerating cavities, such as those used in nuclear physics research, are not only expensive but also difficult to process and cond ...

    STTR Phase II 2001 Department of Energy
  3. N/A

    Amount: $0.00

    N/A

    SBIR Phase I 2000 Department of Energy
  4. N/A

    Amount: $750,000.00

    N/A

    SBIR Phase II 2000 Department of Energy
  5. A 200-kw Average Power Microwave Windo for L-Band Applications

    Amount: $98,000.00

    Not Available This SBIR Phase I proposal will demonstrate the feasibility of integrating current-perpendicular-to-the-plane (CPP), or vertical giant magnetoresistance (VGMR), memory cells with VLSI s ...

    SBIR Phase I 1999 Department of Energy
  6. Energy Efficient Cryogenic Transfer Line with Magnetic Suspension

    Amount: $70,000.00

    Energy efficient, cost effective, cryogenic distribution system (up to several miles) is strongly commanded for spaceport and in-space cryogenic systems. The use of magnetic levitation by permanent ma ...

    SBIR Phase I 2002 National Aeronautics and Space Administration
  7. Energy Efficient Cryogenic Transfer Line with Magnetic Suspension

    Amount: $600,000.00

    Energy efficient, cost effective, cryogenic distribution system (up to several miles) is strongly commanded for spaceport and in-space cryogenic systems. The use of magnetic levitation by permanent ma ...

    SBIR Phase II 2002 National Aeronautics and Space Administration
  8. Innovative Modular, Multiple Power Levels, 325 MHz Spokes Cavities Power Couplers

    Amount: $625,000.00

    In order to increase proton energy up to 8 GeV in a driver linear accelerator, particles must be accelerated through various stages and three different power levels (25kW, 100 kW, and 210kw). Unfortu ...

    SBIR Phase II 2006 Department of Energy
  9. Innovative Modular, Multiple Power Levels, 325 MHz Spokes Cavities Power Couplers

    Amount: $99,993.00

    79766S05 In order to increase proton energy up to 8 GeV in a driver linear accelerator, particles must be accelerated through various stages and three different power levels (25kW, 100 kW, and 210kw). ...

    SBIR Phase I 2005 Department of Energy
  10. SQUID-based Nondestructive Testing Equipment of Dished Niobium Sheets for SRF Cavities

    Amount: $99,997.00

    79784S05 In superconducting cavities used in nuclear physics research, the detection of impurities on to less than 50 micrometer sizes would enable the cavities to reach the highest possible accelerat ...

    SBIR Phase I 2005 Department of Energy

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government