AMERICAN XTAL TECHNOLOGY

Address

4311 Solar Way
Fremont, CA, 94538

Information

DUNS:
# of Employees: 12

Ownership Information

Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N

Award Charts




Award Listing

  1. Production of Semiconductor Grade Crystals from Recovered GaAs and InP Manufac

    Amount: $750,000.00

    On-site recovery of constituent materials from compound semiconductor waste streams presents an opportunity for reduction of hazardous material waste and cost of manufacturing. UDRI has developed a lo ...

    SBIRPhase II1998Missile Defense Agency Department of Defense
  2. Pressure Dependence of AlN Growth Rate

    Amount: $69,969.00

    Slack developed a thermodynamic model to predict how AlN crystal growth would vary with system pressure. He concluded growthrate increases proportionally to the square root of the nitrogen partial pr ...

    SBIRPhase I1998Navy Department of Defense
  3. Optimization of Seeding for AlN Growth

    Amount: $59,986.00

    Aluminum Nitride (A1N) substrates are attractive for III-nitride epitaxial growth due to their high thermal conductivity, close lattice and thermal expansion match to IlI-nitride compositions used for ...

    STTRPhase I1998Missile Defense Agency Department of Defense
  4. Production of Semiconductor Grade Crystals from Recovered GaAs and InP Manufacturing Wastes

    Amount: $59,998.00

    On-site recovery of constituent materials from compound semiconductor waste streams presents an opportunity for reduction of hazardous material waste and cost of manufacturing. UDRI has developed a lo ...

    SBIRPhase I1997Missile Defense Agency Department of Defense
  5. DECISION MAKING IN A GEOGRAPHICALLY DISTRIBUTED ENVIRONMENT

    Amount: $316,529.00

    THE OBJECTIVE IS TO CREATE GROUP DECISION SUPPORT SYSTEM (GDSS) SOFTWARE WHICH PERMITS ARMY PERSONNEL TO QUICKLY MAKE DECISIONS, EVEN WHEN THE DECISION MAKERS ARE LOCATED AROUND THE WORLD. THE SOFTWAR ...

    SBIRPhase II1991Army Department of Defense
  6. Time of flight and absorbance imaging of cerebral spec

    Amount: $497,240.00

    N/A

    SBIRPhase II1991Defense Advanced Research Projects Agency Department of Defense
  7. LARGE DIAMETER CRYSTAL GROWTH OF GAAS USING THE VERTICAL-GRADIENT FREEZE METHOD

    Amount: $49,896.00

    N/A

    SBIRPhase I1990Defense Advanced Research Projects Agency Department of Defense
  8. Time of flight and absorbance imaging of cerebral spec

    Amount: $49,788.00

    N/A

    SBIRPhase I1990Defense Advanced Research Projects Agency Department of Defense
  9. DECISION MAKING IN A GEOGRAPHICALLY DISTRIBUTED ENVIRONMENT

    Amount: $45,680.00

    N/A

    SBIRPhase I1989Army Department of Defense
  10. VEHICLE MONITORING SYSTEM (VMS) DATA ANALYSIS

    Amount: $46,812.00

    THE OBJECTIVE IS TO DEVELOP COMPUTER SOFTWARE WHICH ANALYZES THE OPERATIONAL HISTORY OF ARMY VEHICLES, SUCH AS 5-TON DIESEL TRUCKS, AND BASED ON THIS ANALYSIS RECOMMENDS MAINTENANCE AND OTHER PREVENTI ...

    SBIRPhase I1988Army Department of Defense

Agency Micro-sites

US Flag An Official Website of the United States Government