APPLIED OPTIMIZATION INC

Basic Information

714 E MONUMENT AVE
DAYTON, OH, 45402-1382

http://www.appliedO.com

Company Profile

n/a

Additional Details

Field Value
DUNS: 838936599
Hubzone Owned: N
Socially and Economically Disadvantaged: Y
Woman Owned: N
Number of Employees: 21


  1. Physics and Statistics Based Selection of SLM and EBM Process Parameters to Mitigate Defects and to Control Deposit Microstructure

    Amount: $750,000.00

    The ability to assign a level of confidence for build quality is fundamental to the deployment of powder bed technology. Accordingly, the research objective of this work is to use probability theory ...

    STTR Phase II 2015 National Aeronautics and Space Administration
  2. In Situ, Nondestructive Inspection During Additive Manufacturing of Metallic Parts

    Amount: $79,999.00

    The research objective of this proposal is to demonstrate feasibility to collect and interpret in situ 3-D surface data for the laser sintered top surface for each layer in a powder bed process. The 3 ...

    STTR Phase I 2015 Department of Defense Navy
  3. Innovative Approach to Rapidly Qualify Ti-6Al-4V Metallic Aircraft Parts Manufactured by Additive Manufacturing (AM) Techniques

    Amount: $80,000.00

    The research objective of this proposal is to demonstrate feasibility of accelerating the qualification procedure described in the SAE specification AMS 4999A for alloy Ti-6Al-4V direct deposited prod ...

    SBIR Phase I 2015 Department of Defense Navy
  4. Advanced Algorithms for Non-Resolved Space Based Space Sensing

    Amount: $150,000.00

    The research objective of the proposed effort is to demonstrate and transition an autonomous, rapid determination of satellite features to be used for Threat Indication and Warning (TIN). The scope is ...

    SBIR Phase I 2014 Air Force Department of Defense
  5. Physics-Based Selection of SLM Process Parameters to Mitigate Defects and to Control Deposit Microstructure

    Amount: $124,998.00

    The research objectives of this proposal are to: (1) To adapt the thermal-fluid science procedures for the prediction of weld defects to the prediction and control of surface defects and melt pool ins ...

    STTR Phase I 2014 National Aeronautics and Space Administration
  6. Development of Materials for Metallic Direct Digital Manufacturing

    Amount: $79,998.00

    The research objective of this proposal is to perform computational alloy development to enhance the Ti-6Al-4V chemistry for direct digital manufacturing (DDM). The new alloy will be designed to attai ...

    SBIR Phase I 2013 Department of Defense Navy
  7. Rapid Part Qualification Methodology of Aircraft Metallic Components using Direct Digital Manufacturing Technologies

    Amount: $459,015.00

    The Phase II objective is to demonstrate the vision that the reuse of knowledge gained from known designs for Direct Digital Manufacturing (DDM) of building blocks in a laboratory can be leveraged in ...

    SBIR Phase II 2013 Department of Defense Navy
  8. Space Signatures for Rapid Unambiguous Identification of Satellites

    Amount: $99,996.00

    The research objective of this proposal is to demonstrate a semi-automated association process based upon photometric and astrometric data collected by deep space sensors for UnCorrelated Tracks (UCTs ...

    SBIR Phase I 2013 Defense Advanced Research Projects Agency Department of Defense
  9. Manufacturing Process Optimization of Ultrasonic Bonding of Metallic Composites

    Amount: $99,997.00

    The research objective of the proposed work is to apply the foundational knowledge of ultrasonic bonding, metallic composites, microstructure transformation kinetics and material failure criteria to c ...

    STTR Phase I 2012 Army Department of Defense
  10. Computational Process Model Development for Direct Digital Manufacturing (DDM)

    Amount: $149,975.00

    ABSTRACT: Applied Optimization, Inc. (AO) has developed computational process simulation for the prediction of temperature, residual stress, and melt pool control during the material feed DDM process ...

    SBIR Phase I 2012 Department of Defense Air Force

Agency Micro-sites

US Flag An Official Website of the United States Government